Romania: Parapet and Alerion...

Romanian renewable energy engineering company Parapet has signed seven new contracts with Italian...

North Macedonia: Day-ahead power...

In October 2025, electricity trading on North Macedonia’s day-ahead market reached 146,498 MWh,...

Greece: ExxonMobil, Energean and...

A new stage in Greece’s offshore energy exploration has begun as ExxonMobil, Energean,...

Croatia: CROPEX electricity trading...

In October 2025, a total of 1,449,339.1 MWh of electricity was traded on...
Supported byClarion Energy
HomeSEE Energy NewsRomania: Hidroelectrica awards...

Romania: Hidroelectrica awards contract for first floating solar power plant

Romanian electricity producer Hidroelectrica has awarded a contract for the development of its first floating solar power plant, a key component of the Nufarul pilot project. This initiative marks a major step for the company as it begins integrating floating photovoltaic technology into its renewable energy portfolio.

The contract was awarded through an open public tender initially estimated at over 9.4 million euros (excluding VAT). Two bids were received, with the winning offer of 7.8 million euros (excluding VAT) submitted by Waldevar Energy. The project will span 14 months, with 10 months dedicated to construction.

This is Hidroelectrica’s first venture into floating solar energy. The Nufarul pilot project involves installing a floating solar power system on a reservoir managed by the company, aiming to diversify its renewable energy sources and increase generation capacity. By utilizing existing water surfaces, the project makes efficient use of available infrastructure while combining solar and hydroelectric generation for greater operational effectiveness.

Beyond boosting clean energy output, the initiative is intended to build Hidroelectrica’s expertise in solar technologies, paving the way for similar projects across other hydropower sites.

The floating solar plant will be located in Olt County, southern Romania, on the reservoir used by the Ipotesti Hydropower Plant. It will feature high-efficiency 620 W solar panels, 100 kW inverters, and energy optimizers, with a total installed capacity of 10 MW. The plant is expected to generate around 13.4 GWh of electricity annually.

By advancing this innovative project, Hidroelectrica is reinforcing its role in Romania’s renewable energy transition, harnessing both innovation and existing assets to expand sustainable power production.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Serbia: EPS launches €110 million modernization of Vlasina hydropower plants to boost capacity and extend lifespan

Serbia’s state-owned power utility EPS is continuing its hydropower modernization program, following upgrades at the Bajina Bašta, Zvornik, and Đerdap 1 plants. The next phase will focus on the Vlasina hydropower plants, with a reconstruction and modernization contract signed...

Romania: Parapet and Alerion sign seven new solar projects totaling 80 MW

Romanian renewable energy engineering company Parapet has signed seven new contracts with Italian renewables developer Alerion, expanding their long-term partnership with projects totaling nearly 80.8 MW across Romania and Italy. Construction will take place in Romania’s Teleorman and Călărași counties...

North Macedonia: Day-ahead power trading jumps 82% year-on-year in October 2025

In October 2025, electricity trading on North Macedonia’s day-ahead market reached 146,498 MWh, marking an 81.7% increase compared to the same month last year and a 43% rise from September. According to the market operator MEMO, the average market-clearing price...
Supported byVirtu Energy
error: Content is protected !!