Financing wind in Montenegro,...

The landscape of renewable finance in Southeast Europe has undergone a profound transformation....

How Southeast Europe’s grid...

Wind development in Southeast Europe is accelerating at a pace unimaginable only a...

Serbia–Romania–Croatia: The new triangular...

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside...

The bankability gap in...

The transformation of Southeast Europe into a credible wind-investment region has been rapid,...
Supported byClarion Energy
HomeSEE Energy NewsMontenegro: TPP Pljevlja...

Montenegro: TPP Pljevlja taken offline for scheduled maintenance

Montenegrin coal-fired thermal power plant Pljevlja has been taken offline for scheduled annual maintenance, which should last from 18 April until 2 June.

Power utility EPCG said that this year’s overhaul plan includes maintenance of the boiler plant, replacement of a part of the boiler’s screen tubes, repair of damaged air heaters, overhaul of milling plants and equipment in the engine room, as well as revision of all valves and dampers, maintenance and testing of electrical equipment. The current version of the control system will also be updated. In total, the cost of maintenance works will be around 3.1 million euros.

EPCG Director for Energy Management Darko Krivokapic said that, thanks to good hydrological conditions in this part of the year, regardless of slightly lower rainfall averages in March and the first half of April, the power plant’s shutdown will not affect electricity supply in Montenegro.

Reservoir of HPP Perucica is at balance level, while the reservoir of HPP Piva currently has the potential to produce almost 100 GWh more electricity than planned. This should be enough to cover consumption needs mainly from own sources, without significant electricity imports.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Financing wind in Montenegro, Serbia, Croatia and Romania — why international lenders are returning to Southeast Europe

The landscape of renewable finance in Southeast Europe has undergone a profound transformation. A decade ago, lenders viewed the region with a degree of caution, shaped by fluctuating regulatory frameworks, limited track records, and the perceived fragility of local...

How Southeast Europe’s grid bottlenecks will reshape project valuation, offtake strategy and EPC designs by 2030

Wind development in Southeast Europe is accelerating at a pace unimaginable only a decade ago, yet the region’s grid infrastructure is straining under the weight of its own renewable ambition. Serbia is preparing for multi-gigawatt expansion, Romania is restarting...

Serbia–Romania–Croatia: The new triangular wind corridor — is Southeast Europe becoming Europe’s next Iberia?

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside Europe: strong resource, open land, grid-ready corridors, competitive auctions, and the steady inflow of international capital. Investors seeking scale, yield, and policy clarity migrated naturally towards...
Supported byVirtu Energy
error: Content is protected !!