Romania: PPC Renewables expands...

PPC Renewables Romania has launched the second stage of construction at the Deleni...

Greece: Alexandroupoli LNG terminal...

Gastrade has announced a new operational milestone for the Alexandroupoli LNG terminal, with...

Bulgaria: NPP Kozloduy begins...

Bulgaria’s only nuclear power plant, Kozloduy, announced that Unit 6 will undergo its...

Transelectrica launches major projects...

Romanian electricity transmission system operator Transelectrica has launched two major infrastructure projects to...
Supported byClarion Energy
HomeSEE Energy NewsGreece, PPC, DEPA...

Greece, PPC, DEPA and Damco Energy signed deal on the construction of Alexandroupoli gas-fired plant

Public Power Corporation (PPC), DEPA Trade and Damco Energy (part of the Copelouzos Group) have signed an agreement for the purchase of a 51 % share by PPC in Electroparagogi Alexandroupolis Monoprosopi, a company planning to build and operate an 840 MW gas-fired power plant in Alexandroupoli.

At the same time, DEPA Trade will acquire 29 % stake, while Damco Energy will retain a 20 % stake in the company. Construction of the new plant is planned to begin in the first quarter of 2023 and to be completed in 2025.

The plant is set to be the most efficient in the country, with an efficiency rate of 63 %, and will be able to get natural gas directly from the FSRU in Alexandroupoli, while it is strategically positioned near the IGB pipeline and linked to the Nea Santa high-voltage substation, which is ideally placed for electricity exports to neighboring countries.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania: PPC Renewables expands Deleni wind farm with 85 MW second phase

PPC Renewables Romania has launched the second stage of construction at the Deleni wind farm in Vaslui County, further strengthening its position as the largest wind energy project in the Moldova region. The new phase will add 85 MW...

Romania secures EU approval to keep three coal units operational until 2029

Energy Minister Bogdan Ivan announced that Romania has reached an agreement with the European Commission to keep three of its coal-fired power units in operation until 2029, following a revision of the country’s decarbonization schedule for electricity generation. According to...

Greece: Alexandroupoli LNG terminal reaches record regasification capacity after technical recovery

Gastrade has announced a new operational milestone for the Alexandroupoli LNG terminal, with its maximum daily regasification capacity increasing to 136.2 GWh as of October 21. This marks a significant rise from the 90.8 GWh per day recorded in...
Supported byVirtu Energy
error: Content is protected !!