2030–2035 scenario annex: Gas...

Scenario one: High volatility, tight LNG markets In a scenario characterised by global LNG...

What the European gas...

The European natural gas market has moved decisively away from its pre-2020 equilibrium....

Policy without borders: How...

Electricity market coupling is often discussed in technical or commercial terms, but its...

Fragmented convergence: Why Southeast...

For much of the past decade, the dominant assumption shaping policy and market...
Supported byClarion Energy
HomeSEE Energy NewsGreece, EC has...

Greece, EC has approved the acquisition of joint control of Gastrade

The European Commission (EC) has approved the acquisition of joint control of Gastrade, the Greek company developing the floating liquefied natural gas (LNG) terminal near Alexandroupoli in northern Greece, by Greek natural gas transmission system operator DESFA, Greek gas company DEPA Trade, Cypriot GasLog and Bulgarian natural gas transmission system operator Bulgartransgaz.

The statement from the EC said that the proposed acquisition would raise no competition concerns, given the presence of competing gas import infrastructures and the Greek regulations in place, including those concerning the tariffs to be charged by LNG terminals and those laying down access obligations to LNG terminals and to DESFA’s transmission system.

The Alexandroupoli LNG project, for which Gastrade has obtained a license in 2011, envisages the construction of LNG storage facility with the capacity of 170,000 cubic meters, which could supply 17 million cubic meters of gas per day to Greek gas network. With the construction of gas interconnection between Greece and Bulgaria, the investors are considering options to supply natural gas to the entire Balkan region.

The FSRU will be located 17.6 kilometers southwest of the port of Alexandroupoli and will have gas supply capacity that will exceed 5.5 billion cubic meters per year. The floating unit will be connected to Greek gas transmission system via 28 kilometers long pipeline, through which the regasified LNG will be transmitted to the markets of Greece, Bulgaria and the wider region, from Romania, Serbia and North Macedonia to Hungary, Moldova and Ukraine.

The project supports, complements and works in harmony with, the other existing or planned key gas infrastructure projects in the region such as the Greece-Bulgaria interconnector (IGB), TAP, the Bulgaria-Serbia interconnector, the Greece- North Macedonia interconnector, the Kavala underground gas storage and the Revythoussa LNG terminal.

The consortium for the construction of the terminal should comprise of Gastrade, controlled by Copelouzos Group, (20 %), Gaslog (20 %), Greek Public Gas Corporation DEPA (20 %), now through DEPA Trade, Greek natural gas transmission system operator DESFA (20 %) and Bulgarian Energy Holding BEH through Bulgartransgaz (20 %).

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

2030–2035 scenario annex: Gas prices, CBAM and export margins

Scenario one: High volatility, tight LNG markets In a scenario characterised by global LNG tightness, regulatory uncertainty, and persistent geopolitical risk, European gas prices remain volatile with frequent spikes. Average prices may moderate, but extreme events become more common. Under this...

What the European gas market means for Serbia-based producers and exporters

The European natural gas market has moved decisively away from its pre-2020 equilibrium. Price formation, supply security, and cost competitiveness are no longer primarily dictated by long-term contracts and pipeline marginal costs. Instead, they are shaped by a volatile...

Policy without borders: How Montenegro–Italy coupling constrains domestic energy intervention

Electricity market coupling is often discussed in technical or commercial terms, but its most profound effects are political. By linking Montenegro’s market directly to Italy’s, coupling effectively removes the border as a buffer between domestic energy policy and European...
Supported byVirtu Energy
error: Content is protected !!