Romania: Electricity consumption slightly...

According to data from the National Institute for Statistics (INS), electricity consumption in...

Greece: PPC advances major...

The PPC Group is accelerating renewable energy projects in northern Greece, focusing on...

Greece: Natural gas demand...

The Greek natural gas transmission system operator DESFA reported that total natural gas...

Bosnia and Herzegovina: RS...

The Ministry of Energy and Mining of the Republic of Srpska (RS) has...
Supported byClarion Energy
HomeSEE Energy NewsBulgaria: Gas interconnection...

Bulgaria: Gas interconnection tender with Serbia launched

For the procurement of equipment and the construction of gas interconnection with Serbia, Bulgarian natural gas transmission system operator Bulgartransgaz has launched a tender for a 73.6 million euros.

In January 2017, Bulgarian Minister of Energy Temenuzhka Petkova and her Serbian counterpart Aleksandar Antic have signed a Memorandum of Understanding (MoU) on the project for the construction of gas interconnection between Bulgaria and Serbia. According to the MoU, both sides should pay maximum efforts in order to speed up activities on the project. The construction of the gas pipeline between the two countries should begin by May 2019. Initial plans envisaged that the pipeline should be completed by the end of 2020. The project for gas interconnection between Bulgaria and Serbia envisages the construction of gas pipeline with the annual capacity of 1.8 billion cubic meters of gas. Length of the Bulgarian section of the pipeline, stretching from the border to capital Sofia, is 62 kilometers.

 

 

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania: Electricity consumption slightly declines in first eight months of 2025, solar generation surges 35%

According to data from the National Institute for Statistics (INS), electricity consumption in Romania during the first eight months of 2025 totaled 33.3 TWh, a decline of 0.8% compared to the same period in 2024. Industrial electricity consumption reached 25.06...

Greece: PPC advances major solar and energy storage projects

The PPC Group is accelerating renewable energy projects in northern Greece, focusing on the former lignite power plant sites of Ptolemaida, Kardia, Agios Dimitrios, and Amyntaio. Once fully operational, the solar power plants currently under construction are set to...

Greece: Natural gas demand surges 16.7% in first nine months of 2025 driven by exports and LNG growth

The Greek natural gas transmission system operator DESFA reported that total natural gas demand, including exports, reached 56.36 TWh in the first nine months of 2025, up 16.7% from 48.31 TWh in the same period in 2024. The main driver...
Supported byVirtu Energy
error: Content is protected !!