Financing wind in Montenegro,...

The landscape of renewable finance in Southeast Europe has undergone a profound transformation....

How Southeast Europe’s grid...

Wind development in Southeast Europe is accelerating at a pace unimaginable only a...

Serbia–Romania–Croatia: The new triangular...

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside...

The bankability gap in...

The transformation of Southeast Europe into a credible wind-investment region has been rapid,...
Supported byClarion Energy
HomeSEE Energy NewsBulgaria, CPC has...

Bulgaria, CPC has launched an investigation into proposed acquisition of shares in thermal power plants Bobov Dol and Brikel

The Bulgarian Commission for the Protection of Competition (CPC) announced that it has launched an investigation into proposed acquisition of shares in thermal power plants Bobov Dol and Brikel by Ultimate Energy Investment Group.

Ultimate Energy Investment Group, which requested to acquire an unspecified number of shares in each of the two power plants, is currently inactive. According to CPC, the proposed transactions are not expected to affect the ongoing operations of TPPs Bobov Dol and Brikel, namely production and transmission of thermal and heating energy.

Ultimate Energy Investment Group is not listed in Bulgaria’s commercial register. A US-based company of this name is listed as investing in foreign energy operations, consulting on US and multilateral agency energy programs and resources and assisting the US Department of Defense with renewable energy solutions as well as with introductions to major banks, investment funds and private investors.

TPP Bobov Dol, established in 2000, is located in Kyustendil in southwestern Bulgaria and has an installed capacity of 630 MW. In the first nine months of 2022, TPP Bobov Dol recorded a net loss in the amount of 2.25 million euros, compared to a loss of 9.6 million euros in the same period last year.

TPP Brikel is located in Galabovo and has previously been shut down on several occasions for environmental breaches. It has six boilers with nameplate capacity of 60 MW and four turbines with a nameplate capacity of 50 MW.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Financing wind in Montenegro, Serbia, Croatia and Romania — why international lenders are returning to Southeast Europe

The landscape of renewable finance in Southeast Europe has undergone a profound transformation. A decade ago, lenders viewed the region with a degree of caution, shaped by fluctuating regulatory frameworks, limited track records, and the perceived fragility of local...

How Southeast Europe’s grid bottlenecks will reshape project valuation, offtake strategy and EPC designs by 2030

Wind development in Southeast Europe is accelerating at a pace unimaginable only a decade ago, yet the region’s grid infrastructure is straining under the weight of its own renewable ambition. Serbia is preparing for multi-gigawatt expansion, Romania is restarting...

Serbia–Romania–Croatia: The new triangular wind corridor — is Southeast Europe becoming Europe’s next Iberia?

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside Europe: strong resource, open land, grid-ready corridors, competitive auctions, and the steady inflow of international capital. Investors seeking scale, yield, and policy clarity migrated naturally towards...
Supported byVirtu Energy
error: Content is protected !!