Financing wind in Montenegro,...

The landscape of renewable finance in Southeast Europe has undergone a profound transformation....

How Southeast Europe’s grid...

Wind development in Southeast Europe is accelerating at a pace unimaginable only a...

Serbia–Romania–Croatia: The new triangular...

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside...

The bankability gap in...

The transformation of Southeast Europe into a credible wind-investment region has been rapid,...
Supported byClarion Energy
HomeSEE Energy NewsAlbania, Greece and...

Albania, Greece and Italy approved publishing of Network Code for TAP

As previously approved by the national energy regulatory authorities of Greece, Albania and Italy, TAP AG, a company in charge of the construction and operation of Trans-Adriatic gas pipeline (TAP), has issued the Network Code for the pipeline.

The TAP Network Code has been finalized following the public consultation launched in August 2018, and sets out rules that govern TAP’s services to customers, including shipper registration, credit support, capacity products offered, capacity booking, balancing, usage costs, etc.

TAP will be offering capacity in line with the TAP Network Code through the PRISMA capacity booking platform. The shippers’ registration process opens on 10 August 2020.

TAP’s Head of Commercial Marija Savova said that with the project construction phase now close to completion, preparations are underway for the start of operations.

TAP project envisages 878 km long pipeline that will connect to the Trans-Anatolian (TANAP) near the Turkish-Greek border and cross Greece, Albania and Adriatic Sea before reaching its final destination in Italy. Current shareholders of TAP AG are British Petroleum (20 %), Azeri state-owned SOCAR (20 %), Italian Snam (20 %), Belgian Fluxys (19 %), Spanish Enagas (16 %) and Swiss Axpo with 5 % of the shares. The initial capacity of the pipeline is 10 billion cubic meters of gas per year, with an option to expand the capacity to 20 billion cubic meters. The cost of the project was initially estimated at some 6 billion euros, but in 2016 CEO of TAP AG Ian Bradshaw confirmed that the construction should cost 4.5 million euros. The construction of the Greek section of the pipeline was launched on 17 May 2016, while construction works on the Albanian section started on 30 September same year. The works on the 105 kilometers long offshore section between Albania and Italy started in October 2018.

 

 

 

 

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Financing wind in Montenegro, Serbia, Croatia and Romania — why international lenders are returning to Southeast Europe

The landscape of renewable finance in Southeast Europe has undergone a profound transformation. A decade ago, lenders viewed the region with a degree of caution, shaped by fluctuating regulatory frameworks, limited track records, and the perceived fragility of local...

How Southeast Europe’s grid bottlenecks will reshape project valuation, offtake strategy and EPC designs by 2030

Wind development in Southeast Europe is accelerating at a pace unimaginable only a decade ago, yet the region’s grid infrastructure is straining under the weight of its own renewable ambition. Serbia is preparing for multi-gigawatt expansion, Romania is restarting...

Serbia–Romania–Croatia: The new triangular wind corridor — is Southeast Europe becoming Europe’s next Iberia?

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside Europe: strong resource, open land, grid-ready corridors, competitive auctions, and the steady inflow of international capital. Investors seeking scale, yield, and policy clarity migrated naturally towards...
Supported byVirtu Energy
error: Content is protected !!