2030–2035 scenario annex: Gas...

Scenario one: High volatility, tight LNG markets In a scenario characterised by global LNG...

What the European gas...

The European natural gas market has moved decisively away from its pre-2020 equilibrium....

Policy without borders: How...

Electricity market coupling is often discussed in technical or commercial terms, but its...

Fragmented convergence: Why Southeast...

For much of the past decade, the dominant assumption shaping policy and market...
Supported byClarion Energy
HomeSEE Energy NewsCroatia: HEP launches...

Croatia: HEP launches tender for comprehensive study on new wind farm potential

Croatian state-owned power utility, HEP, has launched a public tender worth €125,000 for a comprehensive study to explore the potential for new wind farms across Croatia. The study will cover both continental counties such as Osijek-Baranja and Vukovar-Srijem, as well as all coastal counties, including Primorje-Gorski Kotar, Lika-Senj, Zadar, Sibenik-Knin, Split-Dalmatia and Dubrovnik-Neretva.

In addition, areas within a 20-kilometer radius of existing hydropower plants—such as HPP Velebit, HPP Vinodol, HPP Zakucac, HPP Orlovac and HPP Senj—will be considered for potential wind farm development due to their more accessible network connection possibilities. The study will also explore wind farm prospects in eastern Croatia, where wind speeds differ from those in Dalmatia. Despite varying wind conditions, eastern Croatia offers simpler network connections, easier wind turbine transport, and lower construction costs. These sites are expected to make use of advanced wind turbine technologies, including turbines with rotor axis heights over 125 meters and diameters exceeding 170 meters.

The study will assess wind potential using available data, along with spatial planning factors such as land ownership, ecological networks, forests, cultural heritage and other relevant considerations. Wind modeling and electricity production estimates will also be included. At the conclusion of the first phase, a detailed report on the most promising locations for wind farm development will be produced.

The project will proceed in two phases. The first phase involves identifying potential sites for new wind farms, while the second phase will evaluate up to 20 existing wind farm projects currently under development. These projects will be assessed for their technical characteristics, administrative status, and investment readiness. Special attention will be given to a detailed analysis of 10 of these projects to identify potential obstacles or risks that could hinder further development. Based on a set of defined criteria, the most promising projects will be ranked for further investment.

The entire study is expected to be completed within six months. Preliminary versions of the studies from both phases will be available within the first few months, with final reports due by the end of the contracted term. The deadline for submitting bids for the tender is 7 January 2025.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

2030–2035 scenario annex: Gas prices, CBAM and export margins

Scenario one: High volatility, tight LNG markets In a scenario characterised by global LNG tightness, regulatory uncertainty, and persistent geopolitical risk, European gas prices remain volatile with frequent spikes. Average prices may moderate, but extreme events become more common. Under this...

Gas vs electricity procurement: Strategic choices fo Serbian exporters

Serbian exporters increasingly face a strategic choice: treat gas and electricity as separate procurement streams or integrate them into a unified energy risk strategy. The latter approach is rapidly becoming essential. Gas procurement indexed fully to TTF offers flexibility but...

Electricity prices, production costs, and export competitiveness: What Serbian manufacturers face when selling into the EU

Electricity pricing has shifted from a background cost to a central competitive variable for Serbian export-oriented production. For companies selling into the European Union, power prices now influence operating margins, contract structure, carbon exposure, and long-term bankability. This is...
Supported byVirtu Energy
error: Content is protected !!