Storage and balancing economics...

The Montenegro–Italy electricity market coupling does more than integrate two markets. It reshapes...

Hydro as a European...

For decades, Montenegro’s hydroelectric system has been perceived primarily through a regional lens....

From arbitrage to algorithms:...

The transition from explicit capacity allocation to market coupling between Montenegro and Italy...

The Adriatic price axis:...

The coupling of Montenegro’s electricity market with Italy’s marks the emergence of a...
Supported byClarion Energy
HomeUncategorizedSerbia: Electricity production...

Serbia: Electricity production at Vinca incinerating plant to start in May

Serbian Vinca Solid Waste Management Center will start producing heat and electricity at full capacity in May 2024, upon the completion of the test operations. According to the president of the Temporary Organ of the City of Belgrade, Aleksandar Sapic, this facility will enable around 5% of electrical and around 10% of heating energy from the waste disposed there.

– I know what the importance of this facility is, due to the new ecological standard which we are all trying to impose in Belgrade in many aspects. This is a facility for the thermal processing of municipal waste, which will be used for the central heating of Belgrade. This way, pollution in the capital of Serbia will be reduced, and waste will replace fossil fuels to a considerable extent – Sapic said.

Vladimir Milovanovic, the director of the company Beo Cista Energija, specified that the treatment for the disposal of waste from fifteen municipalities of the city of Belgrade would be done that way and said that the certification of that project had proven that carbon dioxide emissions would be reduced by 210,000 tons equivalent annually.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Storage and balancing economics in an Adriatic-linked SEE market, 2030–2040

The Montenegro–Italy electricity market coupling does more than integrate two markets. It reshapes the economics of flexibility across Southeast Europe, particularly in relation to storage and balancing. As renewable penetration accelerates and price volatility shifts from energy scarcity to...

Hydro as a European flexibility asset: Montenegro’s reservoirs in a coupled Italy–SEE system

For decades, Montenegro’s hydroelectric system has been perceived primarily through a regional lens. Its reservoirs and run-of-river plants were valued as instruments of domestic supply security and, at most, as balancing assets for neighbouring Balkan systems. Market coupling with...

From arbitrage to algorithms: How market coupling reshapes SEE power desks

The transition from explicit capacity allocation to market coupling between Montenegro and Italy marks a decisive shift in how electricity trading value is created in Southeast Europe. It represents the end of a trading model built around physical control...
Supported byVirtu Energy
error: Content is protected !!