Slovenia: Climate negotiator challenges...

Former Slovenian State Secretary and climate negotiator Zoran Kus has filed a petition...

Romania: Constanța to get...

A new high-efficiency cogeneration plant is under development on the site of the...

Romania: Ministry of Energy...

The Romanian Ministry of Energy has finalized a five-point plan aimed at lowering...

Bosnia and Herzegovina: EPBiH...

State-owned power utility EPBiH has opened a tender for the preparation of the...
Supported byClarion Energy
HomeSEE Energy NewsGreece: The capacity...

Greece: The capacity of e-vehicle charging network should exceed 800 MW

Electric vehicle charging networks in Greece should exceed a capacity of 800 MW by 2030, a level that would facilitate the development of electromobility so that one in three new vehicles can be electric by the end of the decade, according to the revised National Energy and Climate Plan (NECP).

This means charging stations will offer at least 1.3 kW for every purely electric vehicle and 0.8 kW for hybrid models.

The growth of charging infrastructure is expected to be promoted through a comprehensive approach combining tax incentives and subsidies. This strategy will be further bolstered by the implementation of mandatory charging infrastructure in suitable areas. The integration of these measures with the deployment of intelligent systems promises to not only enhance charging efficiency but also offer opportunities for domestic business expansion.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Slovenia: Climate negotiator challenges legality of Krsko nuclear power plant expansion plan

Former Slovenian State Secretary and climate negotiator Zoran Kus has filed a petition with the Constitutional Court challenging the legality of the national spatial plan procedure for the proposed second unit at the Krsko nuclear power plant. Representing public...

Romania: Constanța to get modern gas-hydrogen cogeneration plant, replacing 1970s infrastructure

A new high-efficiency cogeneration plant is under development on the site of the former CET Palas facility in Constanța, replacing infrastructure dating back to the 1970s. Valued at 120 million euros and largely financed through the National Recovery and...

Romania: Ministry of Energy unveils five-point plan to cut electricity prices by 20–25%

The Romanian Ministry of Energy has finalized a five-point plan aimed at lowering electricity prices, with measures expected to take effect next week. Energy Minister Bogdan Ivan stated that the initiative, developed in consultation with producers, distributors, suppliers, and...
Supported byVirtu Energy
error: Content is protected !!