Romania: GE Vernova secures...

GE Vernova has signed an agreement with Greenvolt International Power to supply wind...

Montenegro launches geological surveys...

Geological surveys for the Krusevo hydropower plant have started, marking the first concrete...

Montenegro: EPCG and France’s...

Montenegro’s state-owned power utility EPCG has signed a cooperation agreement with French renewable...

Croatia enters heating season...

Croatia is entering the new heating season with stable gas supplies, high storage...
Supported byClarion Energy
HomeSEE Energy NewsRomania, Crude oil...

Romania, Crude oil imports in the first five months of 2022 amounted to 3.14 tons of oil equivalent

According to the data provided by Romanian National Institute for Statistics (INS), Romania’s crude oil imports in the first five months of 2022 amounted to 3.14 tons of oil equivalent, which is by 242,700 tons of oil equivalent or 7.2 % more than in the same period last year.

At the same time, crude oil production in Romania amounted to 1.224 million tons of oil equivalent, which is 6.2 % or 80,500 tons of oil equivalent less compared to the same period in 2021.

According to the estimates of the National Commission for Strategy and Forecast, domestic crude oil production for 2022 is estimated at 3.17 million tons of oil equivalent (- 2.3 % compared to 2020) and 3.095 million tons of oil equivalent in 2023 (- 2.3 %). Imports are expected to reach 7.25 million tons of oil equivalent this year (+ 6.4 %) and 7.83 million tons of oil equivalent in 2023 (+ 6.5 %).

Romania’s draft Energy Strategy estimates that crude oil production will continue its slow downward trend between 2030 and 2050, and will decrease from 22 to 13 TWh (1.93 to 1.15 million tons of oil equivalent) in that period.

Romania imports oil mainly from Russia and Kazakhstan, as the largest Romanian refineries are owned by companies from Russia (Lukoil – Petrotel) and Kazakhstan (Rompetrol – Petromidia).

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania to permanently close Isalnita coal-fired power plant in January 2026

Romania’s Ministry of Energy has announced that the coal-fired Isalnita thermal power plant in Dolj county will be permanently shut down on 1 January 2026. The plant is part of the Energy Complex (EC) Oltenia. Energy Minister Bogdan Ivan made...

Romania: GE Vernova secures order to supply 252 MW Ialomita wind project

GE Vernova has signed an agreement with Greenvolt International Power to supply wind turbines for the 252 MW Ialomita wind farm in southeastern Romania. The order, confirmed in the third quarter of 2025, includes the delivery, installation, and commissioning of...

Montenegro launches geological surveys for strategic HPP Krusevo

Geological surveys for the Krusevo hydropower plant have started, marking the first concrete step in one of Montenegro’s key energy projects. The work follows a contract signed on 29 November 2024 between EPCG and the Jaroslav Cerni Institute for...
Supported byVirtu Energy
error: Content is protected !!