Financing wind in Montenegro,...

The landscape of renewable finance in Southeast Europe has undergone a profound transformation....

How Southeast Europe’s grid...

Wind development in Southeast Europe is accelerating at a pace unimaginable only a...

Serbia–Romania–Croatia: The new triangular...

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside...

The bankability gap in...

The transformation of Southeast Europe into a credible wind-investment region has been rapid,...
Supported byClarion Energy
HomeSEE Energy NewsBosnia and Herzegovina,...

Bosnia and Herzegovina, Gross electricity production in the FBiH in March amounted to 730 GWh

Gross electricity production in the Federation of Bosnia and Herzegovina (FBiH) in March 2022 amounted to 730 GWh, which is by 20.5 % lower compared to March last year, when it amounted to 918 GWh.

Net electricity production amounted to 673 GWh, of which 213 GWh (31.6 %) was produced in hydropower plants, 410 GWh (60.9 %) was produced in thermal power plants, while wind farms produced 50 GWh. In March, electricity imports amounted to 39 GWh, compared to 14 GWh in the same month last year, while electricity exports amounted to 164 GWh, compared to 538 GWh last March.

In the same month, production of brown coal amounted to 331,918 tons, which is 9.8 % less compared to 2020 when the production stood at 367,789 tons. Lignite production in March 2022 amounted to 127,477 tons, while in March 2021 it amounted to 145,111 tons, a 12.2 % decrease.

Coke production in March 2022 totaled 76,797 tons, which is 2.7 % less than 78.903 tons produced in March 2021.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Financing wind in Montenegro, Serbia, Croatia and Romania — why international lenders are returning to Southeast Europe

The landscape of renewable finance in Southeast Europe has undergone a profound transformation. A decade ago, lenders viewed the region with a degree of caution, shaped by fluctuating regulatory frameworks, limited track records, and the perceived fragility of local...

How Southeast Europe’s grid bottlenecks will reshape project valuation, offtake strategy and EPC designs by 2030

Wind development in Southeast Europe is accelerating at a pace unimaginable only a decade ago, yet the region’s grid infrastructure is straining under the weight of its own renewable ambition. Serbia is preparing for multi-gigawatt expansion, Romania is restarting...

Serbia–Romania–Croatia: The new triangular wind corridor — is Southeast Europe becoming Europe’s next Iberia?

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside Europe: strong resource, open land, grid-ready corridors, competitive auctions, and the steady inflow of international capital. Investors seeking scale, yield, and policy clarity migrated naturally towards...
Supported byVirtu Energy
error: Content is protected !!