Slovenia: Climate negotiator challenges...

Former Slovenian State Secretary and climate negotiator Zoran Kus has filed a petition...

Romania: Constanța to get...

A new high-efficiency cogeneration plant is under development on the site of the...

Romania: Ministry of Energy...

The Romanian Ministry of Energy has finalized a five-point plan aimed at lowering...

Bosnia and Herzegovina: EPBiH...

State-owned power utility EPBiH has opened a tender for the preparation of the...
Supported byClarion Energy
HomeSEE Energy NewsBulgaria: TPP Maritsa...

Bulgaria: TPP Maritsa East 2 has been allocated an annual quota

The Energy Ministry has received opinions from the directors of the National Electricity Company (NEK) and electricity transmission system operator ESO related to the need for ensuring the reliable operation, security and sustainability of the country’s electricity system which requires maintaining Maritsa East 2 in operation. Caretaker Minister of Energy Andrey Zhekov signed an order according to which, state-owned coal-fired thermal power plant Maritsa East 2 has been allocated an annual quota of 1 GWh of electricity on the regulated market between 1 July 2021 and 30 June 2022.

The setting of an annual quota for the coal-fired power plant is in response to that need. According to the Ministry, this is a short-term measure which will ensure the operation of plant in the next year and a smooth transition with a view to the environmental requirements and economic realities in relation to CO2 intensive producers. The transition to more environmental friendly industries in the Maritsa East complex will take place gradually and without social stress through the use of various instruments provided by the European Commission: National Recovery and Resilience Plan and the Just Transition Fund. Parallel to that, the Ministry of Energy has proposed for inclusion in the National Recovery and Resilience Plan projects for the gasification of industrial capacities in the region and projects for new generation capacities using renewable energy sources. This will provide a horizon for the development of the region in line with the challenges of the EU Green Deal and will have a positive impact on the operation of entire Bulgarian Energy Holding (BEH).

 

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Slovenia: Climate negotiator challenges legality of Krsko nuclear power plant expansion plan

Former Slovenian State Secretary and climate negotiator Zoran Kus has filed a petition with the Constitutional Court challenging the legality of the national spatial plan procedure for the proposed second unit at the Krsko nuclear power plant. Representing public...

Romania: Constanța to get modern gas-hydrogen cogeneration plant, replacing 1970s infrastructure

A new high-efficiency cogeneration plant is under development on the site of the former CET Palas facility in Constanța, replacing infrastructure dating back to the 1970s. Valued at 120 million euros and largely financed through the National Recovery and...

Romania: Ministry of Energy unveils five-point plan to cut electricity prices by 20–25%

The Romanian Ministry of Energy has finalized a five-point plan aimed at lowering electricity prices, with measures expected to take effect next week. Energy Minister Bogdan Ivan stated that the initiative, developed in consultation with producers, distributors, suppliers, and...
Supported byVirtu Energy
error: Content is protected !!