Slovenia: Climate negotiator challenges...

Former Slovenian State Secretary and climate negotiator Zoran Kus has filed a petition...

Romania: Constanța to get...

A new high-efficiency cogeneration plant is under development on the site of the...

Romania: Ministry of Energy...

The Romanian Ministry of Energy has finalized a five-point plan aimed at lowering...

Bosnia and Herzegovina: EPBiH...

State-owned power utility EPBiH has opened a tender for the preparation of the...
Supported byClarion Energy
HomeSEE Energy NewsRomania: Illegal state...

Romania: Illegal state aid to EC Oltenia

Last week, Minister Popescu said that that the Government prepared a new restructuring plan of EC Oltenia, which is well received by the European Commission. Greenpeace Romania announced that the Government has extended a 240 million euros loan to troubled coal-based electricity producer Energy Complex (EC) Oltenia before receiving the final opinion from the European Commission on its plans to support the company. The organization reminded that the Energy Minister Virgil Popescu previously informally said that the state will extend the bridge loan to EC Oltenia in order to purchase emission certificates for 2020, but the recently signed ordinance envisages that the loan provided by the state would convert into a grant after the company’s successful implementation of restructuring plan. The loan will have to be returned only if EC Oltenia fails to implement the plan in full.

According to the new plan, EC Oltenia will operate just two coal-fired units at TPP Rovinari by 2026-27, which means 1,000 MW less in coal-fired capacity, since the initial version envisaged 1.650 MW of coal-fired capacity in operation in 2026. He stressed that this is the largest decarbonization effort made by Romania. Installed capacity of TPP Rovinari will be reduced from 3,570 MW in 2021 to 660 MW in 2027, which is 82 % reduction in six years. This will also result in the reduction of annual CO2 emissions from 8.6 million tons in 2021 to 2.6 million tons in 2027. He also added that, after 2025, the remaining two units will be solely operated on market principle, without and subsidies. In late 2020, the Romanian Government has signed the Memorandum for the restructuring of state-owned EC Oltenia under a five-year program that involves some 2 billion euros of support from both state and the European Union’s decarbonization program. The memorandum involves 1.33 billion euros of state aid, out of which 250 million was already extended as a rescue loan that the company could not return. The company will use the state aid for financing the purchase of CO2 certificates over the period when the group is replacing its traditional coal-fired power unit with more modern gas-fired units and renewable energy capacities. Last month, The European Commission said that it has initiated an in-depth investigation into the restructuring plan of EC Oltenia, expressing doubts about the process.

 

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Slovenia: Climate negotiator challenges legality of Krsko nuclear power plant expansion plan

Former Slovenian State Secretary and climate negotiator Zoran Kus has filed a petition with the Constitutional Court challenging the legality of the national spatial plan procedure for the proposed second unit at the Krsko nuclear power plant. Representing public...

Romania: Constanța to get modern gas-hydrogen cogeneration plant, replacing 1970s infrastructure

A new high-efficiency cogeneration plant is under development on the site of the former CET Palas facility in Constanța, replacing infrastructure dating back to the 1970s. Valued at 120 million euros and largely financed through the National Recovery and...

Romania: Ministry of Energy unveils five-point plan to cut electricity prices by 20–25%

The Romanian Ministry of Energy has finalized a five-point plan aimed at lowering electricity prices, with measures expected to take effect next week. Energy Minister Bogdan Ivan stated that the initiative, developed in consultation with producers, distributors, suppliers, and...
Supported byVirtu Energy
error: Content is protected !!