North Macedonia expands Bogdanci...

North Macedonia’s state-owned power company ESM has partnered with Danish wind technology firm...

Greece accelerates smart meter...

Greece’s long-delayed shift to smart electricity metering is now making notable progress after...

Bulgaria: Vertical Gas Corridor...

On 29 May, a formal inspection of the Vertical Gas Corridor infrastructure was...

Bosnia and Herzegovina: FBiH...

The Federation of Bosnia and Herzegovina (FBiH) is moving forward with plans to...
Supported byClarion Energy
HomeUncategorizedThe power plant...

The power plant Nikola Tesla B capital overhaul began on Unit B2

 

Another 620megawatt generator in power plant Nikola Tesla B from 14 May is outside of the power system, the realization of capital overhaul is underway.

In the next four months overhaul on B2 will be done through a very complex and extensive procedures. Among the most important activities is primarily the reconstruction of electrostatic precipitators ESP. That work is largely financed by donations from the European Union. The contract for part of the work financed by donations is entrusted to the Polish Rafako, with local companies sub-contractors Gosaassembly and IZOPROGRES. The obligation of TENT is the creation of sedimentary electrode, supply transformers, removal of equipment and works on the key contributions of electrostatic precipitators. After reconstruction of the ESP on Unit 2, particulate emissions will be reduced to below 50mg/Nm3 in flue gas, which is in accordance with national and European norms.

In addition to standard operations, other capital repairs and reconstruction are planed: the grid for afterburning, slag system, replacement of superheater, inter heaters 1 and 3 as well as extensive alterations to the pneumatic transport of ash and slag in order to restore the equipment to the projected level and with minor modifications. Significant replacement on parts of the boiler pipe system will be implemented by Feromont and Termoelektro, a supplier of tubular elements is

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Albania: SOCAR to begin supplying natural gas to Korca

The State Oil Company of Azerbaijan (SOCAR) is set to launch natural gas supply operations in the Albanian city of Korca, marking the first phase of a larger initiative aimed at establishing a comprehensive gas distribution network throughout the...

FBiH: Net electricity production reached 473 GWh in June

Net electricity generation in the Federation of BiH fell to 473 GWh in June 2024 from 582 GWh in the same month last year, according to the data published by the statistical office. In the same period, electricity imports increased to 126 GWh...

Croatia: JANAF buys 5.2 MW solar park

Croatian oil pipeline operator JANAF has indirectly acquired the Bulinac solar photovoltaic power plant with an installed capacity of 5.18 MW as part of its diversification strategy, the company said in a filing to the Zagreb stock exchange.The acquisition of this...
Supported byVirtu Energy
error: Content is protected !!