Gross electricity production in North Macedonia decreased by an annual 35.3% in March 2024, to 455,607 MWh, according to the data published by the statistical...
Gross electricity production in North Macedonia increased by 11.5% in November 2023 compared to the same month previous year, to 550,205 MWh.
In the same...
The shutdown of Pljevlja transforms Montenegro’s internal energy balance, but its implications extend beyond national borders. In the interconnected Balkan power system, every addition...
Montenegro’s power system is undergoing a quiet reordering of influence. Where state hydro once dominated unchallenged and Pljevlja provided the stable backbone, private wind...
As Montenegro steps into a future without Pljevlja’s coal-fired stability, the cost of balancing becomes the defining economic metric of its power system. Balancing...
Montenegro finds itself at a key inflection point. The only coal-fired thermal power plant in the country, Yugoslav Thermal Power Plant Pljevlja (TPP Pljevlja),...
Designing an integration strategy for hydropower, storage and renewables in South-East Europe means accepting that no single technology can deliver both decarbonisation and stability....
X
Latest Electricity Power Trading News now available in app