Greece achieves record electricity...

Greece recorded a historic electricity export performance in the first half of 2025,...

Bulgaria threatens to withdraw...

State-owned Bulgarian Energy Holding (BEH) has expressed concerns about the Black Sea submarine...

Bosnia and Herzegovina: FBiH...

The Government of the Federation of Bosnia and Herzegovina (FBiH) has approved a...

Albania: ALPEX reports September...

The Albanian electricity exchange, ALPEX, reported that the total volume of electricity traded...
Supported byClarion Energy
HomeSEE Energy NewsSlovenia NPP Krsko...

Slovenia NPP Krsko produced 192.6 GWh in November

Nuclear power plant Krsko produced 192,623 MWh of net electricity in November 2023, which is 1.7% less than planned (196,000 MWh) for this month.

NPP Krsko was offline between mid-October and mid-November due to a leak in the primary system.

In November 2022, NPP Krsko generated 358,529 MWh of net electricity.

The plant is working under the constraints of technological specifications and all security systems are operable. Availability and capacity factors stood at 100% and there were no reported technical problems.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Region: Hungary’s MOL to boost oil supplies to Serbia amid U.S. sanctions

Hungarian Foreign Minister Peter Szijjarto announced that MOL will increase crude oil and fuel supplies to Serbia following U.S. sanctions on the Serbian oil sector. He emphasized that MOL’s key role in Serbia’s supply chain ensures additional deliveries, though...

Greece achieves record electricity exports in first half of 2025

Greece recorded a historic electricity export performance in the first half of 2025, with export volumes reaching 571 GWh from January to June, according to transmission system operator ADMIE. This represents a sharp rise compared to just 22 GWh...

Bulgaria threatens to withdraw from Black Sea submarine cable project without direct national connection

State-owned Bulgarian Energy Holding (BEH) has expressed concerns about the Black Sea submarine cable project, warning that Bulgaria may withdraw unless the planned underwater electricity line includes a direct connection to the country’s transmission network. The initiative, promoted by the...
Supported byVirtu Energy
error: Content is protected !!