SEE’s electricity market: Structure,...

The South-East European electricity market has always stood apart from the mature, deeply...

Cross-border power corridors shaping...

South-East Europe is moving through a period of structural change, driven by accelerating...

Traders’ hydro-volatility map for...

From a trader’s perspective, hydropower in South-East Europe is less about reservoirs and...

2030–2040 hydro-balancing forecast model...

Between 2030 and 2040 hydropower in South-East Europe shifts from being primarily an...
Supported byClarion Energy
HomeSEE Energy NewsSlovenia: Independent review...

Slovenia: Independent review confirms economic viability of Krsko nuclear power plant expansion

The independent international review of the economic analysis for the second unit at Slovenia’s Krsko nuclear power plant has confirmed its initial viability. The estimated investment cost, excluding financing, ranges from €9.6 billion to €15.4 billion. Gen Energija, the sole investor, plans to proceed with caution, emphasizing the need for careful risk assessment.

Conducted by Ernst & Young and Assystem, the review found that Gen Energija’s estimated investment and operational costs are acceptable by current standards. No unacceptable assessments were noted, although uncertainties remain around financing, maintenance, and fuel costs, which will depend on future supplier negotiations.

To mitigate these uncertainties, reviewers recommend engaging suppliers early and enhancing the financial structure to maximize the project’s economic benefits. The choice of reactor technology and financing methods will significantly influence costs, with project delays potentially adding substantial expenses.

Gen Energija’s revised analysis did not significantly alter the estimated investment costs, though operational cost estimates were slightly reduced. The projected costs per kilowatt for the reactor design range around €7,625, with additional location-specific costs and unforeseen expenses accounted for.

The electricity cost from the new unit is projected between €41.9/MWh for a 1,650 MW reactor and €45.6/MWh for a 1,000 MW reactor. For profitability, electricity prices during operation need to be between €65 and €70/MWh, based on a long-term projection of €75/MWh.

While two-thirds of scenarios suggest the project will be financially viable, the potential risks highlight the importance of monitoring investment, financing costs, and construction timelines. Overall, Gen Energija remains optimistic about the project’s long-term benefits.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

SEE’s electricity market: Structure, competition, traders, strategies and the next decade of transformation

The South-East European electricity market has always stood apart from the mature, deeply liquid and algorithmically saturated markets of Western and Northern Europe. The Western Balkans region—extending through Serbia, Montenegro, Bosnia and Herzegovina, North Macedonia, Albania, and partially linked...

Cross-border power corridors shaping South-East Europe: Interconnections, congestions and the new gravitational pull of the EU electricity market

South-East Europe is moving through a period of structural change, driven by accelerating renewable deployment, constrained transmission corridors, and a new continental price geography that increasingly radiates outward from the European Union’s core. The region stretching from Hungary through...

Hydro–storage–renewables integration strategy for SEE

Designing an integration strategy for hydropower, storage and renewables in South-East Europe means accepting that no single technology can deliver both decarbonisation and stability. Wind and solar bring energy and cost advantages. Hydro brings dispatchable flexibility and system strength....
Supported byVirtu Energy
error: Content is protected !!