Romania: End of price...

Electricity bills for July and part of August 2025 in Romania are significantly...

Bosnia and Herzegovina sees...

According to the Agency for Statistics of Bosnia and Herzegovina (BiH), gross electricity...

Albania: Electricity production falls...

According to data from the Albanian Institute of Statistics (INSTAT), electricity production in...

Romania: Energy Vault partners...

Swiss energy storage company Energy Vault has signed an agreement to provide up...
Supported byClarion Energy
HomeNews Serbia EnergySerbia: Vetroelektrana Banat-5...

Serbia: Vetroelektrana Banat-5 to develop 120 MW wind farm and solar power plants in Alibunar municipality

Vetroelektrana Banat-5, a local company, is moving forward with plans to build a 120 MW wind farm, along with two solar power plants, in the Alibunar municipality. The Detailed Regulation Plan (DRP), currently under public review, covers an area of approximately 2,503 hectares.

The project will be carried out in two phases. The first phase will involve the installation of 28 wind turbines in the cadastral areas of Banatski Karlovac and Nikolinci. The second phase will focus on developing two solar power plants in Banatski Karlovac.

Initial assessments suggest that each wind turbine will have a capacity of up to 8 MW, bringing the total installed capacity of the wind farm to 120 MW. The wind turbine towers, including the blades at their highest position, will reach a maximum height of 250 meters, with rotor diameters of around 190 meters.

As for the solar power plants, one will have a maximum installed capacity of 60 MW, while the other will have up to 70 MW. WindVision, a Belgian-Dutch company, owns Vetroelektrana Banat-5. In 2019, WindVision and the municipality of Alibunar signed an agreement for the right of easement to install electricity transmission cables for the construction of a new wind farm, Banat 1. This complex will consist of two wind farms: Banat 1 near Vladimirovac, which will feature 44 turbines and a total capacity of 186 MW, and Banat 2 near Nikolinci, with 25 turbines and a capacity of 140 MW.

Additionally, in 2023, Vetroelektrana Banat-4 presented the DRP for the Vetropark-1 wind farm in the areas of Banatsko Novo Selo, Kacarevo, and Pancevo. This complex will include 25 turbines with a total installed capacity of 150 MW.

Last month, Emergy Group, in partnership with WindVision International, completed a deal to sell 168 MW of wind projects in Serbia to Heavy Energy International, a Hong Kong-based subsidiary of Chinese wind turbine manufacturer Sany Renewable Energy. This transaction includes the rights to the Alibunar wind farm A and B sites, with a combined capacity of 168 MW, expected to produce around 480 GWh of electricity annually.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Slovenia: Wind Energy Association calls for balanced policy consultation

The Slovenian Wind Energy Association (GIZ) has expressed concern that recent political debates on wind energy are being shaped by what it views as an unbalanced event. The association says conclusions from a June consultation in the National Council—attended...

Serbia: US extends sanctions deadline for NIS until late September

The US Department of the Treasury has once again delayed the enforcement of sanctions on Serbian oil company NIS, marking the sixth extension of the deadline. According to the Serbian Government, the new date for the possible implementation is...

Romania: End of price caps and VAT hike drive sharp rise in electricity bills

Electricity bills for July and part of August 2025 in Romania are significantly higher than in previous months, driven by multiple factors. A heatwave increased consumption as air conditioners and cooling devices were used extensively. At the same time,...
Supported byVirtu Energy
error: Content is protected !!