Romania: Cernavoda Unit 2...

Unit 2 of Romania’s sole nuclear power plant, Cernavoda, was brought back online...

Montenegro: Major renewable energy...

Two significant renewable energy projects are progressing in the village of Korita, located...

Bulgaria: Solaris Holding launches...

Solaris Holding, a joint venture between Bulgarian-German solar developer Sunotec and Eurohold Bulgaria,...

Bosnia and Herzegovina: Electricity...

Gross electricity production in the Federation of Bosnia and Herzegovina (FBiH) reached 512...
Supported byClarion Energy
HomeNews Serbia EnergySerbia: EPS advocates...

Serbia: EPS advocates pumped-storage hydropower over lithium batteries for renewable energy storage

While lithium has been touted in Serbia as a solution for various challenges, including electromobility and renewable energy storage, experts from the state-owned power utility EPS express caution regarding its use for electricity storage.

EPS experts argue that storing electricity generated from wind and solar energy is more effectively achieved through pumped-storage hydropower plants rather than lithium-ion batteries. One of the main concerns with batteries is the lack of recycling technology, which poses environmental risks. With battery lifespans ranging from 20 to 25 years and no sustainable recycling methods currently available, EPS prefers reversible hydroelectric plants for energy storage.

In 2023, renewable energy sources accounted for 41.58% of Serbia’s energy mix, up from 33.04% in 2019. The government aims to generate 1,500 MW from wind and solar by 2026. This significant increase in renewable energy capacity within a few years may come as a surprise, but hydropower has historically contributed about one-third of Serbia’s total electricity production.

Out of the 8 GW of installed capacity in Serbia, approximately 3 GW is derived from hydropower. While other European nations have harnessed over 70% of their hydropower potential, EPS still sees room for growth. Currently, about 60% of the Danube’s potential, 40% of the Drina’s, and 50% of the Uvac’s have been utilized, indicating further opportunities for new hydroelectric facilities.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Serbia: US Treasury grants NIS fourth 30-day sanctions reprieve

For the fourth time since April, the US Department of the Treasury has extended Serbian oil company NIS’s waiver from full sanctions implementation, pushing the new deadline to 29 July 2025. This extension follows NIS’s recent application for a special...

Romania: Cernavoda Unit 2 returns to service following safety inspections and smoke incident

Unit 2 of Romania’s sole nuclear power plant, Cernavoda, was brought back online on the morning of 27 June after a controlled shutdown on 25 June for inspections and minor repairs. Operator Nuclearelectrica confirmed that all corrective actions complied...

Montenegro: Major renewable energy projects advance in Korita

Two significant renewable energy projects are progressing in the village of Korita, located in Bijelo Polje municipality, Montenegro: a €200 million solar power plant and a wind farm with an installed capacity of 72.6 MW. The wind farm, developed by...
Supported byVirtu Energy
error: Content is protected !!