The Balkan grid at...

As winter settles across South-East Europe, the region’s electricity landscape enters a season...

The Balkan power mosaic:...

The final month of 2025 finds the electricity markets of South-East Europe entering...

Winter markets at the...

The western edge of the Balkan electricity system enters December 2025 with a...

Winter prices without the...

December 2025 opens the winter season in Central and South-East Europe with a...
Supported byClarion Energy
HomeNews Serbia EnergySerbia: Balkan Stream...

Serbia: Balkan Stream gas pipeline’s test run

Test run of the Balkan Stream gas pipeline (the extension of TurkStream pipeline intended to bring Russian gas to southeastern and central Europe) has started, according to Serbian media.

At the moment, the automatic and control systems, the dispatching stations, valves, optics and power supply are being tested, so that the conditions would meet for the gas to start flowing from Bulgaria as soon as 30 December.

Director of Serbian gas company Srbijagas Dusan Bajatovic said in an interview that the pipes of the interconnector between the Bulgarian and the Hungarian border are filled with gas and all the systems necessary for reliable operations of the gas pipeline which is part of the internal gas transport system of Serbia are being tested at the moment. He assured that the gas pipeline will be ready for operation on 30 December and that Serbia will start being supplied with gas from Bulgaria as soon as 1 January 2021. This means that Serbia will be supplied with gas from the direction of Bulgaria, which, along with the existing direction from Hungary, now presents new possibilities, but also a greater degree of security of supply of the markets of Serbia and Bosnia and Herzegovina.

The information on the test run was also confirmed by Serbian President Aleksandar Vucic.

Serbia has completed the laying of the pipes for its section of the TurkStream gas pipeline extension in December last year. The construction of Serbian section, connecting Bulgarian and Hungarian borders, has officially started in May 2019. With an envisaged capacity of almost 14 billion cubic meters of gas per year, 403 kilometers long Serbian section should be put into operation as early as 2020, and reach its full capacity during 2022. The operator of the pipeline in Serbia is local company Gastrans, a joint venture between Russian Gazprom and state-owned gas company Srbijagas.

 

 

 

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Serbia’s energy dilemma: EPS faces a slow-burning crisis amid calls for accountability

For decades, Serbia’s national utility, Elektroprivreda Srbije (EPS), operated under the illusion of indestructibility. Its sprawling lignite mines, ageing thermal plants and hydropower dams formed the backbone of a system that appeared resistant to regional shocks, political storms and...

Serbia’s energy future at stake in post-Russia gas power struggle

For more than two decades, Serbia’s political and economic stability rested on a simple, unwritten assumption: Russian gas would continue to flow, reliably, predictably and at preferential terms negotiated quietly between Belgrade and Moscow. The relationship was never merely...

Sanctions on NIS trigger Serbia’s most severe financial stress test in a generation

When the United States expanded its sanctions targeting Russian energy interests, few policymakers in Belgrade initially grasped the magnitude of what was unfolding. On the surface, nothing had changed: Serbia’s biggest oil company, NIS, majority-owned by Gazprom Neft, continued...
Supported byVirtu Energy
error: Content is protected !!