Romania: End of price...

Electricity bills for July and part of August 2025 in Romania are significantly...

Bosnia and Herzegovina sees...

According to the Agency for Statistics of Bosnia and Herzegovina (BiH), gross electricity...

Albania: Electricity production falls...

According to data from the Albanian Institute of Statistics (INSTAT), electricity production in...

Romania: Energy Vault partners...

Swiss energy storage company Energy Vault has signed an agreement to provide up...
Supported byClarion Energy
HomeSEE Energy NewsRussia and Hungary...

Russia and Hungary confirm progress at the NPP Paks 2 project

Following talks in Budapest, Rosatom Director General Alexey Likhachev, and Hungary’s Minister of Foreign Affairs & Trade Peter Szijjártó confirmed that work on the construction of new power units at the Paks NPP (Paks II) is proceeding at a rapid pace. The Paks II project was launched in 2014 by an inter-governmental agreement between Hungary and Russia for two VVER-1200 reactors (units 5&6) to be supplied by Rosatom. The contract was supported by a Russian state loan to finance the majority of the project.

The Hungarian Atomic Energy Authority issued the licence for the units in August 2022. The following December, the Hungarian parliament approved the extension of the life of the four existing VVER-440 power units at the Paks NPP for another 20 years. The current life of the station’s nuclear reactors would have ended in 2032-2037, and now it is assumed that they will work until at least 2052-2057. Paks currently provides half of all generated and one-third of the consumed electricity in Hungary.

Last year, ahead of schedule, excavation was carried out to a depth of 5 metres – the level of groundwater. The construction of an impervious curtain – a special underground concrete wall around the excavation 2,700 meters long – was completed, which will protect the excavation from groundwater infiltration and ensure the safe operation of the operating units during the construction of new ones. The soil is now being strengthened and the ground is consolidated.

At a joint press conference with Likhachev, Szijjártó said soil consolidation work is currently underway on an area of 17 hectares, which requires the drilling of 75,000 piles, 8.000 of which are already in place. He then stressed that this work will be done by a German company and will have to complete it by the summer of 2025. During the summer, it is planned to start excavation of the foundation pit to the design depth of 30 metres. After that, work will begin on the preparation of reinforced concrete for the future foundation slab.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Slovenia: Wind Energy Association calls for balanced policy consultation

The Slovenian Wind Energy Association (GIZ) has expressed concern that recent political debates on wind energy are being shaped by what it views as an unbalanced event. The association says conclusions from a June consultation in the National Council—attended...

Romania: End of price caps and VAT hike drive sharp rise in electricity bills

Electricity bills for July and part of August 2025 in Romania are significantly higher than in previous months, driven by multiple factors. A heatwave increased consumption as air conditioners and cooling devices were used extensively. At the same time,...

Bosnia and Herzegovina sees mixed energy output trends in June 2025

According to the Agency for Statistics of Bosnia and Herzegovina (BiH), gross electricity production in June 2025 totaled 1,000 GWh, compared to 1,028 GWh in the same month last year. Hydropower plants accounted for 26.4 percent of total gross...
Supported byVirtu Energy
error: Content is protected !!