Financing wind in Montenegro,...

The landscape of renewable finance in Southeast Europe has undergone a profound transformation....

How Southeast Europe’s grid...

Wind development in Southeast Europe is accelerating at a pace unimaginable only a...

Serbia–Romania–Croatia: The new triangular...

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside...

The bankability gap in...

The transformation of Southeast Europe into a credible wind-investment region has been rapid,...
Supported byClarion Energy
HomeSEE Energy NewsRomania, State has...

Romania, State has committed to sell stake 20 % in the company by the end of 2026

According to the restructuring plan of coal-based electricity producer Energy Complex (EC) Oltenia, which was approved by the European Commission in early January, the Romanian state has committed to sell stake 20 % in the company by the end of 2026.

The restructuring plan envisages total investments in the company of 3.9 billion euros by 2026, of which 2.5 billion euros comes from state aid. The main restructuring measures include the coal phase-out, the separation of the Craiova power plant into a separate legal entity, staff reductions, operational excellence and efficient management, digitalization and the abandonment of non-core assets.

The plan also envisages the construction of 1,325 MW in combined cycle gas plants (to be put into operation in 2026) and of 735 MW in solar power plants (in operation in 2024), to replace the current coal-based capacities.

However, the plan stipulates that two coal-fired units at TPP Rovinari and one at TPP Turceni will remain in capacity reserve until 2030 and 2029, respectively, meaning that they will be able to use coal to produce electricity in case of need. The three units have a total capacity of about 1,000 MW.

Regarding the coal phase-out, the Romanian state pledged to create a separate subsidiary of EC Oltenia which will include and operate existing coal -fired units groups and other assets of the EC Oltenia not including gas-pired and RES power plants. The accounts of the coal-based subsidiary will also be separated from those of the EC Oltenia. These lignite capacities will be reduced over time until they are completely phased-out, in accordance with the national schedule.

At the end of the restructuring period, 20 % of the state-owned stake in the company will be sold on the market. It is unknown at this time if the shares will be listed on the stock exchange.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Financing wind in Montenegro, Serbia, Croatia and Romania — why international lenders are returning to Southeast Europe

The landscape of renewable finance in Southeast Europe has undergone a profound transformation. A decade ago, lenders viewed the region with a degree of caution, shaped by fluctuating regulatory frameworks, limited track records, and the perceived fragility of local...

How Southeast Europe’s grid bottlenecks will reshape project valuation, offtake strategy and EPC designs by 2030

Wind development in Southeast Europe is accelerating at a pace unimaginable only a decade ago, yet the region’s grid infrastructure is straining under the weight of its own renewable ambition. Serbia is preparing for multi-gigawatt expansion, Romania is restarting...

Serbia–Romania–Croatia: The new triangular wind corridor — is Southeast Europe becoming Europe’s next Iberia?

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside Europe: strong resource, open land, grid-ready corridors, competitive auctions, and the steady inflow of international capital. Investors seeking scale, yield, and policy clarity migrated naturally towards...
Supported byVirtu Energy
error: Content is protected !!