Romania: Cernavoda Unit 2...

Unit 2 of Romania’s sole nuclear power plant, Cernavoda, was brought back online...

Montenegro: Major renewable energy...

Two significant renewable energy projects are progressing in the village of Korita, located...

Bulgaria: Solaris Holding launches...

Solaris Holding, a joint venture between Bulgarian-German solar developer Sunotec and Eurohold Bulgaria,...

Bosnia and Herzegovina: Electricity...

Gross electricity production in the Federation of Bosnia and Herzegovina (FBiH) reached 512...
Supported byClarion Energy
HomeSEE Energy NewsRomania: Coal production...

Romania: Coal production reached nearly 2 million toe in the first nine months

Net coal production in Romania in the first nine months of 2023 reached 1.918 million tons of oil equivalent. That is 16%, or 366,700 toe less than in the same period in 2022.

In the same period, Romania imported 166,700 toe of coal, which is 51% less compared to the same period last year.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania: Cernavoda Unit 2 returns to service following safety inspections and smoke incident

Unit 2 of Romania’s sole nuclear power plant, Cernavoda, was brought back online on the morning of 27 June after a controlled shutdown on 25 June for inspections and minor repairs. Operator Nuclearelectrica confirmed that all corrective actions complied...

Montenegro: Major renewable energy projects advance in Korita

Two significant renewable energy projects are progressing in the village of Korita, located in Bijelo Polje municipality, Montenegro: a €200 million solar power plant and a wind farm with an installed capacity of 72.6 MW. The wind farm, developed by...

Montenegro: EPCG secures €25.63 million EBRD loan to expand Gvozd wind farm capacity

Montenegrin state-owned power utility EPCG has obtained government approval to borrow 25.63 million euros from the European Bank for Reconstruction and Development (EBRD) to finance the second phase of the Gvozd wind farm, which will add 21 MW of...
Supported byVirtu Energy
error: Content is protected !!