Romania: End of price...

Electricity bills for July and part of August 2025 in Romania are significantly...

Bosnia and Herzegovina sees...

According to the Agency for Statistics of Bosnia and Herzegovina (BiH), gross electricity...

Albania: Electricity production falls...

According to data from the Albanian Institute of Statistics (INSTAT), electricity production in...

Romania: Energy Vault partners...

Swiss energy storage company Energy Vault has signed an agreement to provide up...
Supported byClarion Energy
HomeSEE Energy NewsRegion: MOL unveils...

Region: MOL unveils Central and Eastern Europe’s largest green hydrogen plant at Százhalombatta refinery

MOL Group has launched Central and Eastern Europe’s largest green hydrogen plant at its Százhalombatta refinery, marking a significant step in the region’s sustainability efforts. The new facility, equipped with a 10 megawatt electrolysis unit, will produce 1,600 tonnes of clean, carbon-neutral green hydrogen annually. This initiative is set to cut the Danube Refinery’s carbon dioxide emissions by 25,000 tonnes per year—equivalent to the annual CO₂ emissions of approximately 5,400 typical cars.

The Százhalombatta plant, inaugurated in April, aligns with MOL Group’s SHAPE TOMORROW strategy aimed at enhancing regional sustainability, competitiveness, and self-sufficiency. The plant utilizes electrolysis technology from Plug Power, which decomposes water into hydrogen and oxygen using electricity from renewable sources, producing no harmful by-products. The process yields 8-9 tonnes of pure oxygen per tonne of hydrogen produced, leveraging Plug Power’s nearly 50 years of operational expertise in hydrogen generation.

Ádám Horváth, Vice President of New and Sustainable Businesses at MOL Group, emphasized the importance of green hydrogen as a versatile and clean energy source. “Green hydrogen is not only a key component in our fuel production but will soon be directly utilized in the transportation sector as well. This aligns with our strategic goal of supporting the green energy transition. Following Százhalombatta, we plan to establish similar plants in Bratislava and Rijeka, with the latter projected to commence operations in 2026.”

The EUR 22 million investment in the Százhalombatta plant represents a crucial step towards reducing the carbon footprint of the Danube Refinery. The new technology is expected to gradually replace the natural gas-based production processes, which currently contribute to one-sixth of MOL Group’s total CO₂ emissions.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Slovenia: Wind Energy Association calls for balanced policy consultation

The Slovenian Wind Energy Association (GIZ) has expressed concern that recent political debates on wind energy are being shaped by what it views as an unbalanced event. The association says conclusions from a June consultation in the National Council—attended...

Romania: End of price caps and VAT hike drive sharp rise in electricity bills

Electricity bills for July and part of August 2025 in Romania are significantly higher than in previous months, driven by multiple factors. A heatwave increased consumption as air conditioners and cooling devices were used extensively. At the same time,...

Bosnia and Herzegovina sees mixed energy output trends in June 2025

According to the Agency for Statistics of Bosnia and Herzegovina (BiH), gross electricity production in June 2025 totaled 1,000 GWh, compared to 1,028 GWh in the same month last year. Hydropower plants accounted for 26.4 percent of total gross...
Supported byVirtu Energy
error: Content is protected !!