Financing wind in Montenegro,...

The landscape of renewable finance in Southeast Europe has undergone a profound transformation....

How Southeast Europe’s grid...

Wind development in Southeast Europe is accelerating at a pace unimaginable only a...

Serbia–Romania–Croatia: The new triangular...

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside...

The bankability gap in...

The transformation of Southeast Europe into a credible wind-investment region has been rapid,...
Supported byClarion Energy
HomeSEE Energy NewsRegion, KOSTT borders:...

Region, KOSTT borders: Yearly auctions for 2021

Yearly auctions for 2021 on borders Albania-Kosovo, Kosovo-Montenegro and Kosovo- North Macedonia will be held on 15 December, said South eastern Europe Coordinated Auction Office (SEE CAO), a regional company that organizes auctions for cross-border transmission capacities.

Participants may submit bids for 200 MW in each direction for bilateral transmission between Kosovo and Albania and for 100 MW for Kosovo- Montenegro, in the form of a basic product. The capacity for the border with Northern Macedonia is two times 100 MW, but the winners will reserve it with the proportional reduction during maintenance. The results of the auction will be published on 17 December.

In October, the Regional Group of Continental Europe (RGCE), a body of the European Network of Transmission System Operators (ENTSO-E) decided that the new Connection Agreement, signed between Kosovo’s electricity transmission system operator KOSTT and ENTSO-E in July, comes into effect as it determined that KOSTT met all the conditions set out in the agreement and is ready to operate independently of Serbia. According to the agreement, Kosovo will operate as an independent regulatory zone within the Kosovo-Albania Regulatory Block (AK block) under the synchronous area of Continental Europe. Thus, KOSTT and Kosovo will leave the SMM (Serbia, Montenegro, North Macedonia) which is coordinated by Serbian transmission operator EMS.

Yearly Auctions for cross-border capacities in south eastern Europe for 2021 with offered capacities, auction dates and available results are listed in our Energy Daily edition on pages 48-49.

 

 

 

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Financing wind in Montenegro, Serbia, Croatia and Romania — why international lenders are returning to Southeast Europe

The landscape of renewable finance in Southeast Europe has undergone a profound transformation. A decade ago, lenders viewed the region with a degree of caution, shaped by fluctuating regulatory frameworks, limited track records, and the perceived fragility of local...

How Southeast Europe’s grid bottlenecks will reshape project valuation, offtake strategy and EPC designs by 2030

Wind development in Southeast Europe is accelerating at a pace unimaginable only a decade ago, yet the region’s grid infrastructure is straining under the weight of its own renewable ambition. Serbia is preparing for multi-gigawatt expansion, Romania is restarting...

Serbia–Romania–Croatia: The new triangular wind corridor — is Southeast Europe becoming Europe’s next Iberia?

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside Europe: strong resource, open land, grid-ready corridors, competitive auctions, and the steady inflow of international capital. Investors seeking scale, yield, and policy clarity migrated naturally towards...
Supported byVirtu Energy
error: Content is protected !!