Romania: Cernavoda Unit 2...

Unit 2 of Romania’s sole nuclear power plant, Cernavoda, was brought back online...

Montenegro: Major renewable energy...

Two significant renewable energy projects are progressing in the village of Korita, located...

Bulgaria: Solaris Holding launches...

Solaris Holding, a joint venture between Bulgarian-German solar developer Sunotec and Eurohold Bulgaria,...

Bosnia and Herzegovina: Electricity...

Gross electricity production in the Federation of Bosnia and Herzegovina (FBiH) reached 512...
Supported byClarion Energy
HomeSEE Energy NewsMontenegro: EBRD plans...

Montenegro: EBRD plans €18 million loan for new transmission line to boost renewable energy integration

The European Bank for Reconstruction and Development (EBRD) is considering a loan of up to 18 million euros for the construction of a new 110 kV Herceg Novi – Vilusi overhead transmission line in southwestern Montenegro, along with associated substations. This project aims to facilitate the integration of future renewable energy capacities in the region.

According to the EBRD, the loan will be extended to Montenegrin electricity transmission system operator CGES and will finance the construction of the 38.5-kilometer transmission line, the extension of a 110 kV switchyard at the Herceg Novi substation, and the refurbishment of the Vilusi substation.

The primary goal of the project is to enhance the high voltage transmission network capacity, which is essential for integrating a significant number of renewable energy power plants that are currently in the preliminary development stages by private entities. The EBRD Board is set to make a decision regarding the loan on December 4.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Serbia: US Treasury grants NIS fourth 30-day sanctions reprieve

For the fourth time since April, the US Department of the Treasury has extended Serbian oil company NIS’s waiver from full sanctions implementation, pushing the new deadline to 29 July 2025. This extension follows NIS’s recent application for a special...

Romania: Cernavoda Unit 2 returns to service following safety inspections and smoke incident

Unit 2 of Romania’s sole nuclear power plant, Cernavoda, was brought back online on the morning of 27 June after a controlled shutdown on 25 June for inspections and minor repairs. Operator Nuclearelectrica confirmed that all corrective actions complied...

Montenegro: Major renewable energy projects advance in Korita

Two significant renewable energy projects are progressing in the village of Korita, located in Bijelo Polje municipality, Montenegro: a €200 million solar power plant and a wind farm with an installed capacity of 72.6 MW. The wind farm, developed by...
Supported byVirtu Energy
error: Content is protected !!