Financing wind in Montenegro,...

The landscape of renewable finance in Southeast Europe has undergone a profound transformation....

How Southeast Europe’s grid...

Wind development in Southeast Europe is accelerating at a pace unimaginable only a...

Serbia–Romania–Croatia: The new triangular...

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside...

The bankability gap in...

The transformation of Southeast Europe into a credible wind-investment region has been rapid,...
Supported byClarion Energy
HomeUncategorizedKosovo: First solar...

Kosovo: First solar auction closed at 48.88 euros/MWh

A consortium led by Switzerland-based construction company Orllati was selected to build and operate a solar park of up to 105 MW in connection capacity for 30 years including a 15-year contract for difference. The group won the first renewable electricity auction in Kosovo with a bid of 48.88 euros per MWh.

Almost a year after the initial public call, the Ministry of Economy completed its pilot solar power auction. Even though it raised the ceiling price in late December to 75 euros/MWh from 65 euros/MWh amid repeated delays, it was closed at 48.88/MWh.

Switzerland-based Orllati leads the winning consortium, consisting of companies from Germany and Kosovo. 

The victory in the electronic auction translates to the right to take land on lease for a photovoltaic park of 90 MW to 105 MW in total connection capacity and up to 117 MW in peak terms. Orllati agreed to build and operate the facility for 30 years, of which the first 15 years it would sell electricity under a contract for difference (CfD) equalling the winning price.

The government-owned land is in the cadastral zones of Kramovik and Petković (Guri i Kuq) in the municipality of Rahovec or Orahovac.

Two Turkish consortia participated in the auction – Çalik and Limak, and Güri̇ş İnşaat ve Mühendislik (Güri̇ş Construction and Engineering) – together with Akuo Energy, headquartered in France, and Egypt-based Elswedy Electric. It consisted of four rounds, the ministry said. The first one, with 43 bids, drove the price down to 57 euros/MWh, while the final level was reached in the third one, Balkan Green Energy News reports.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Financing wind in Montenegro, Serbia, Croatia and Romania — why international lenders are returning to Southeast Europe

The landscape of renewable finance in Southeast Europe has undergone a profound transformation. A decade ago, lenders viewed the region with a degree of caution, shaped by fluctuating regulatory frameworks, limited track records, and the perceived fragility of local...

How Southeast Europe’s grid bottlenecks will reshape project valuation, offtake strategy and EPC designs by 2030

Wind development in Southeast Europe is accelerating at a pace unimaginable only a decade ago, yet the region’s grid infrastructure is straining under the weight of its own renewable ambition. Serbia is preparing for multi-gigawatt expansion, Romania is restarting...

Serbia–Romania–Croatia: The new triangular wind corridor — is Southeast Europe becoming Europe’s next Iberia?

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside Europe: strong resource, open land, grid-ready corridors, competitive auctions, and the steady inflow of international capital. Investors seeking scale, yield, and policy clarity migrated naturally towards...
Supported byVirtu Energy
error: Content is protected !!