Romania: Cernavoda Unit 2...

Unit 2 of Romania’s sole nuclear power plant, Cernavoda, was brought back online...

Montenegro: Major renewable energy...

Two significant renewable energy projects are progressing in the village of Korita, located...

Bulgaria: Solaris Holding launches...

Solaris Holding, a joint venture between Bulgarian-German solar developer Sunotec and Eurohold Bulgaria,...

Bosnia and Herzegovina: Electricity...

Gross electricity production in the Federation of Bosnia and Herzegovina (FBiH) reached 512...
Supported byClarion Energy
HomeSEE Energy NewsHungary: MET Group...

Hungary: MET Group commissions second solar power plant, expanding green energy capacity

MET Group has commissioned its second solar power plant in Hungary, located in Kaba in the eastern part of the country. The new MET Kaba II Solar Park spans 31 hectares and features over 33,000 solar panels. This 23.4 MW project was developed internally as a greenfield initiative following the success of the first Kaba solar power plant, which was commissioned in 2021.

Clive Turton, Executive Chairman of MET Group’s Green Assets Division, highlighted the significant growth of solar energy in Hungary in recent years, noting that solar power accounted for approximately 19.5% of the country’s total electricity generation in 2023 and around 33% of the current energy mix. He emphasized that solar power, being low-cost, abundant, and 100% sustainable, will play a crucial role in the energy transition both in Europe and globally.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania: Cernavoda Unit 2 returns to service following safety inspections and smoke incident

Unit 2 of Romania’s sole nuclear power plant, Cernavoda, was brought back online on the morning of 27 June after a controlled shutdown on 25 June for inspections and minor repairs. Operator Nuclearelectrica confirmed that all corrective actions complied...

Montenegro: Major renewable energy projects advance in Korita

Two significant renewable energy projects are progressing in the village of Korita, located in Bijelo Polje municipality, Montenegro: a €200 million solar power plant and a wind farm with an installed capacity of 72.6 MW. The wind farm, developed by...

Montenegro: EPCG secures €25.63 million EBRD loan to expand Gvozd wind farm capacity

Montenegrin state-owned power utility EPCG has obtained government approval to borrow 25.63 million euros from the European Bank for Reconstruction and Development (EBRD) to finance the second phase of the Gvozd wind farm, which will add 21 MW of...
Supported byVirtu Energy
error: Content is protected !!