Romania: Cernavoda Unit 2...

Unit 2 of Romania’s sole nuclear power plant, Cernavoda, was brought back online...

Montenegro: Major renewable energy...

Two significant renewable energy projects are progressing in the village of Korita, located...

Bulgaria: Solaris Holding launches...

Solaris Holding, a joint venture between Bulgarian-German solar developer Sunotec and Eurohold Bulgaria,...

Bosnia and Herzegovina: Electricity...

Gross electricity production in the Federation of Bosnia and Herzegovina (FBiH) reached 512...
Supported byClarion Energy
HomeUncategorizedHungary: E.ON to...

Hungary: E.ON to install 43 MW solar power plant for BMW factory

E.ON Hungaria announced that it has signed an agreement to install 43 MW solar park at BMW Group’s new factory in Debrecen.

The utility, a member of Germany energy company E.ON said it would cover 510,000 square metres of surface in solar panels, placing them on the buildings and other areas at the car maker’s Debrecen factory. These panels will be capable of generating close to 45 GWh, or about as much to power 20,000 households.

This will be the BMW Group’s largest solar farm, according to Hans-Peter Kemser, president and CEO of the Debrecen factory.

E.ON Hungaria will finalise the installation by the end of 2025. The BMW vehicle factory will start test production during 2024.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Montenegro: Major renewable energy projects advance in Korita

Two significant renewable energy projects are progressing in the village of Korita, located in Bijelo Polje municipality, Montenegro: a €200 million solar power plant and a wind farm with an installed capacity of 72.6 MW. The wind farm, developed by...

Bulgaria: Solaris Holding launches new 59.8 MW hybrid solar facility with battery storage

Solaris Holding, a joint venture between Bulgarian-German solar developer Sunotec and Eurohold Bulgaria, has commissioned its newest hybrid renewable energy facility near Selanovtsi, close to Vratsa in northwestern Bulgaria. The project covers nearly 38 hectares and includes a 59.8 MW...

Romania: Hidroelectrica awards contract for first floating solar power plant

Romanian electricity producer Hidroelectrica has awarded a contract for the development of its first floating solar power plant, a key component of the Nufarul pilot project. This initiative marks a major step for the company as it begins integrating...
Supported byVirtu Energy
error: Content is protected !!