Romania: Cernavoda Unit 2...

Unit 2 of Romania’s sole nuclear power plant, Cernavoda, was brought back online...

Montenegro: Major renewable energy...

Two significant renewable energy projects are progressing in the village of Korita, located...

Bulgaria: Solaris Holding launches...

Solaris Holding, a joint venture between Bulgarian-German solar developer Sunotec and Eurohold Bulgaria,...

Bosnia and Herzegovina: Electricity...

Gross electricity production in the Federation of Bosnia and Herzegovina (FBiH) reached 512...
Supported byClarion Energy
HomeSEE Energy NewsHungary, 67.9 %...

Hungary, 67.9 % of primary domestic energy consumption was provided by primary fossil fuels

According to the annual energy statistics report of the Hungarian Energy and Public Utilities Regulatory Office (MEKH), in 2021, 67.9 % of primary domestic energy consumption was provided by primary fossil fuels.

Some 15.2 % was provided by nuclear energy, 11.7 % by primary renewable energy sources, and 4 % by electricity imports. The remaining 1.2 % came from non-renewable waste and energy from other sources.

Regarding fossil fuels, the use of coal and coal products decreased by 18.3 %.

On the other hand the use of petroleum and petroleum products increased by 8.7 % and natural gas by 6.1 % compared to the previous year .

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania: Cernavoda Unit 2 returns to service following safety inspections and smoke incident

Unit 2 of Romania’s sole nuclear power plant, Cernavoda, was brought back online on the morning of 27 June after a controlled shutdown on 25 June for inspections and minor repairs. Operator Nuclearelectrica confirmed that all corrective actions complied...

Montenegro: Major renewable energy projects advance in Korita

Two significant renewable energy projects are progressing in the village of Korita, located in Bijelo Polje municipality, Montenegro: a €200 million solar power plant and a wind farm with an installed capacity of 72.6 MW. The wind farm, developed by...

Montenegro: EPCG secures €25.63 million EBRD loan to expand Gvozd wind farm capacity

Montenegrin state-owned power utility EPCG has obtained government approval to borrow 25.63 million euros from the European Bank for Reconstruction and Development (EBRD) to finance the second phase of the Gvozd wind farm, which will add 21 MW of...
Supported byVirtu Energy
error: Content is protected !!