Financing wind in Montenegro,...

The landscape of renewable finance in Southeast Europe has undergone a profound transformation....

How Southeast Europe’s grid...

Wind development in Southeast Europe is accelerating at a pace unimaginable only a...

Serbia–Romania–Croatia: The new triangular...

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside...

The bankability gap in...

The transformation of Southeast Europe into a credible wind-investment region has been rapid,...
Supported byClarion Energy
HomeSEE Energy NewsGreece: Three big...

Greece: Three big industrial consumers left PPC

Large industrial electricity consumers are leaving the state-controlled supplier branch of the Public Power Corporation (PPC). The largest electricity consumer in the country, with average annual consumption of 3 TWh, Aluminium of Greece,  is already partially supplied by other suppliers, Protergia and Watt+Volt. Aluminium producer launched a push towards full independence from PPC by utilizing the renewable energy portfolio of its subsidiaries.

At the same time, metals producer Viohalco Group, with annual consumption of 1.4 TWh, has also left PPC and is now supplied by Heron. The company is seeking to procure electricity from solar power plants operated by Terna Energy.

Oil refiner Helleniq Energy (former Hellenic Petroleum) has also left PPC and is supplied by Elpedison. The next big player to switch suppliers could be Titan Cement, with annual consumption of 0.5 TWh. Titan’s contract with PPC expires in June and the cement producer is already seeking alternatives, with Heron and Protergia as contenders.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Financing wind in Montenegro, Serbia, Croatia and Romania — why international lenders are returning to Southeast Europe

The landscape of renewable finance in Southeast Europe has undergone a profound transformation. A decade ago, lenders viewed the region with a degree of caution, shaped by fluctuating regulatory frameworks, limited track records, and the perceived fragility of local...

How Southeast Europe’s grid bottlenecks will reshape project valuation, offtake strategy and EPC designs by 2030

Wind development in Southeast Europe is accelerating at a pace unimaginable only a decade ago, yet the region’s grid infrastructure is straining under the weight of its own renewable ambition. Serbia is preparing for multi-gigawatt expansion, Romania is restarting...

Serbia–Romania–Croatia: The new triangular wind corridor — is Southeast Europe becoming Europe’s next Iberia?

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside Europe: strong resource, open land, grid-ready corridors, competitive auctions, and the steady inflow of international capital. Investors seeking scale, yield, and policy clarity migrated naturally towards...
Supported byVirtu Energy
error: Content is protected !!