The Balkan grid at...

As winter settles across South-East Europe, the region’s electricity landscape enters a season...

The Balkan power mosaic:...

The final month of 2025 finds the electricity markets of South-East Europe entering...

Winter markets at the...

The western edge of the Balkan electricity system enters December 2025 with a...

Winter prices without the...

December 2025 opens the winter season in Central and South-East Europe with a...
Supported byClarion Energy
HomeSEE Energy NewsGreece: ADMIE to...

Greece: ADMIE to invest 5.5 billion euros by 2034

 

Investments of 5.5 billion euros are included in the new 10-year Development Plan of the Independent Power Transmission Operator (ADMIE) for the period 2025-2034 which is to be put to public consultation in the next few days before being submitted for approval to the Regulatory Authority for Energy.

In the new plan, reference is made for the first time to the new large-scale international connections with Germany (Green Aegean Interconnector) via the Adriatic and Saudi Arabia (Saudi Greek Interconnection) that ADMIE is studying, while the most mature plans for the connections with Cyprus-Israel and Egypt are also included, projects that are included in the planning for the promotion of Greece as a transmission and supply channel in Europe with green energy.

The design for the Green Aegean Interconnector concerns a total transmission capacity of 3 gigawatts with further development in the second year to 6-9 GW.

The proposed route of the project, which has an initial estimated budget of €8.1 billion, includes an undersea passage from Greece through the Adriatic to Slovenia, and then via an overland route to Austria and southern Germany.

 

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

The Balkan grid at a turning point: How cross-border capacities shape the winter 2025–26 electricity market

As winter settles across South-East Europe, the region’s electricity landscape enters a season shaped not by crisis but by structural interdependence. December 2025 finds the Balkan and Central-European power systems operating under a degree of cross-border coordination once unimaginable....

The Balkan power mosaic: December 2025 prices and the regional outlook for Q1 2026

The final month of 2025 finds the electricity markets of South-East Europe entering winter with a stability few would have predicted even two years ago. The whip-saw volatility of the post-Ukraine crisis era has eased, gas is trading at...

Winter markets at the periphery: How Montenegro, Croatia and Albania shape their place in the regional power price landscape

The western edge of the Balkan electricity system enters December 2025 with a familiar imbalance: structurally small power exchanges, modest liquidity, highly weather-sensitive production, and an almost total dependence on neighbouring hubs for price formation. Montenegro, Croatia and Albania...
Supported byVirtu Energy
error: Content is protected !!