Trading Southeast Europe’s power...

Electricity trading in Southeast Europe (SEE) is no longer about forecasting average prices....

Spreads, congestion, and flexibility:...

Electricity trading in Southeast Europe (SEE) has entered a new phase. The region...

How Europe’s power market...

Europe’s electricity market is not becoming calmer. It is becoming more precise. The...

Grid-connection and flexibility reform...

Much of the debate around Southeast Europe (SEE) electricity market integration focuses on...
Supported byClarion Energy
HomeSEE Energy NewsGreece: Admie plans...

Greece: Admie plans to speed up procedures for the Great Sea Interconnection project

Cyprus has been urged to cough up its €100 million financial share in the Great Sea Interconnector project in a meeting between Greece’s Independent Power Transmission Operator, Admie and Cyprus Finance Minister Makis Keravnos.

In a statement, Admie said its senior management held a meeting with Cyprus’ finance minister to brief him on the progress of the project’s development.

The Great Sea Interconnector aims to link the electricity grids of Cyprus, Greece and Israel, with Admie specifying its senior management held meetings with Cypriot and Israeli government officials. The aim is to “speed up the procedures for implementing the electrical interconnection” between the three countries.

During the meeting with Keravnos, Admie briefed the minister on the progress of the project’s development.

The transmission operator’s management asked Keravnos to speed up the procedures on implementing the cabinet’s decision for Cyprus’ involvement in the project to the tune of up to €100m.

“Admie has already spent over €150m for the project, and explained to the finance minister that it looks forward to Cyprus’ participation for the continuation of the project.”

Both parties agreed to take steps to secure funding from the European Investment Bank (EIB).

According to Admie, Israel’s energy minister and the energy regulatory authority have given the Great Sea Interconnector its full backing.

A meeting is expected to take place in person in April over the matter, the operator specified.

Cyprus’ electricity interconnection with Israel will require a cost-benefit study (CBA), which the regulators of both countries will rely on to allocate the costs recovered from the revenues (Cross Border Cost Allocation).

The two sides agreed to set up technical teams to prepare the study to have it ready shortly.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Trading Southeast Europe’s power markets: A practical playbook for signals, timing, and risk

Electricity trading in Southeast Europe (SEE) is no longer about forecasting average prices. It is about understanding when prices break away from expectations, where congestion appears before it is visible in spot markets, and how volatility migrates across borders....

Spreads, congestion, and flexibility: Why SEE has become Europe’s real power trading arena

Electricity trading in Southeast Europe (SEE) has entered a new phase. The region is no longer defined by static net import or export positions, nor by simple convergence toward EU benchmarks. Instead, SEE has become Europe’s most dynamic trading arena—a...

How Europe’s power market redesign is exporting volatility into Southeast Europe

Europe’s electricity market is not becoming calmer. It is becoming more precise. The distinction matters profoundly for Southeast Europe (SEE). What is often described as stabilisation at the EU level—through market redesign, long-term contracts, and pricing reform—is in practice...
Supported byVirtu Energy
error: Content is protected !!