Slovenia: Climate negotiator challenges...

Former Slovenian State Secretary and climate negotiator Zoran Kus has filed a petition...

Romania: Constanța to get...

A new high-efficiency cogeneration plant is under development on the site of the...

Romania: Ministry of Energy...

The Romanian Ministry of Energy has finalized a five-point plan aimed at lowering...

Bosnia and Herzegovina: EPBiH...

State-owned power utility EPBiH has opened a tender for the preparation of the...
Supported byClarion Energy
HomeNews Serbia EnergyEBRD considers €90...

EBRD considers €90 million loan for solar-thermal plant in Novi Sad

The European Bank for Reconstruction and Development (EBRD) is considering a loan of up to 90 million euros to support the construction of a large-scale solar-thermal plant in Novi Sad, located in Serbia’s northern province of Vojvodina.

According to the bank’s statement, the project will be executed by the municipal district heating company Novosadska Toplana, in collaboration with the city of Novi Sad and Serbia’s Ministry of Mining and Energy.

The solar plant will feature 38,600 square meters of solar collector fields, seasonal heat storage, a heat pump, and an electric boiler. The total estimated cost of the project is 104.7 million euros, with the loan anticipated to be approved in early December.

Additionally, the project will receive co-financing through an investment grant from the European Union’s Western Balkans Investment Framework (WBIF). This initiative is part of the EBRD’s Green Cities Window 1 Framework and aims to assist Serbia in decarbonizing its district heating sector, ensuring a more efficient, reliable, and eco-friendly heat supply for households, public institutions, and businesses in Novi Sad.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Slovenia: Climate negotiator challenges legality of Krsko nuclear power plant expansion plan

Former Slovenian State Secretary and climate negotiator Zoran Kus has filed a petition with the Constitutional Court challenging the legality of the national spatial plan procedure for the proposed second unit at the Krsko nuclear power plant. Representing public...

Romania: Ministry of Energy unveils five-point plan to cut electricity prices by 20–25%

The Romanian Ministry of Energy has finalized a five-point plan aimed at lowering electricity prices, with measures expected to take effect next week. Energy Minister Bogdan Ivan stated that the initiative, developed in consultation with producers, distributors, suppliers, and...

Bosnia and Herzegovina: EPBiH launches tender for Janjići hydropower plant design amid ongoing legal disputes

State-owned power utility EPBiH has opened a tender for the preparation of the main design for the Janjići hydropower plant on the Bosna River. The estimated contract value is around 800,000 euros, with the lowest bid set as the...
Supported byVirtu Energy
error: Content is protected !!