2030–2035 scenario annex: Gas...

Scenario one: High volatility, tight LNG markets In a scenario characterised by global LNG...

What the European gas...

The European natural gas market has moved decisively away from its pre-2020 equilibrium....

Policy without borders: How...

Electricity market coupling is often discussed in technical or commercial terms, but its...

Fragmented convergence: Why Southeast...

For much of the past decade, the dominant assumption shaping policy and market...
Supported byClarion Energy
HomeSEE Energy NewsCroatia: Korlat solar...

Croatia: Korlat solar power plant set to become largest renewable energy hub by 2026

The Korlat solar power plant, set to become operational in 2026, will be the largest solar facility in Croatia with an installed capacity of 99 MW. The project, valued at around 70 million euros, is expected to produce approximately 165 GWh of electricity annually, enough to supply about 50,000 households. As a hybrid energy park combined with the nearby wind farm, Korlat’s total output could meet the needs of up to 100,000 households.

Located next to an operational wind farm since 2021, the project covers roughly 150 hectares and includes infrastructure to connect to a 110 kV transmission network. Installation began in late 2024, with 160,000 photovoltaic panels mounted on single-axis tracking systems to maximize efficiency.

The construction and maintenance contracts were awarded following European Bank for Reconstruction and Development (EBRD) guidelines. The plant is financed by loans totaling 62 million euros from the EBRD and the European Investment Bank (EIB), with up to 80% backed by Croatian state guarantees.

Future expansion plans include adding a battery storage system of up to 30 MW/90 MWh capacity and an additional 40 MW solar facility. This project is part of Croatia’s broader green transition strategy, with state utility HEP planning over 1,500 MW of renewable capacity across hydropower, wind, solar, and storage, totaling nearly 1.7 billion euros in investments to boost energy independence and reach EU carbon neutrality goals.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

2030–2035 scenario annex: Gas prices, CBAM and export margins

Scenario one: High volatility, tight LNG markets In a scenario characterised by global LNG tightness, regulatory uncertainty, and persistent geopolitical risk, European gas prices remain volatile with frequent spikes. Average prices may moderate, but extreme events become more common. Under this...

Gas vs electricity procurement: Strategic choices fo Serbian exporters

Serbian exporters increasingly face a strategic choice: treat gas and electricity as separate procurement streams or integrate them into a unified energy risk strategy. The latter approach is rapidly becoming essential. Gas procurement indexed fully to TTF offers flexibility but...

Electricity prices, production costs, and export competitiveness: What Serbian manufacturers face when selling into the EU

Electricity pricing has shifted from a background cost to a central competitive variable for Serbian export-oriented production. For companies selling into the European Union, power prices now influence operating margins, contract structure, carbon exposure, and long-term bankability. This is...
Supported byVirtu Energy
error: Content is protected !!