Region: Romania, Greece sign...

At the Partnership for Transatlantic Energy Cooperation 2025 (P-TEC 2025) forum in Athens,...

Romania: Day-ahead power prices...

The average day-ahead electricity price on Romania’s OPCOM energy exchange rose to 121.9...

Hungary granted one-year US...

Hungarian Prime Minister Viktor Orbán announced that Hungary has secured an exemption from...

EU regulator urges Greece...

The European Union Agency for the Cooperation of Energy Regulators (ACER) has urged...
Supported byClarion Energy
HomeSEE Energy NewsCroatia: INA plans...

Croatia: INA plans to build solar power plant in Sisak

Croatian media reported that the national oil company INA is planning to build a solar power plant with installed capacity of 2-3 MW on the site of its oil refinery in Sisak.

INA has already submitted a request to the Ministry of Energy and Environmental Protection for an estimation of the need for environmental impact assessment. The company plans to install solar panels on an area of 33,000 square meters which is mainly free of buildings at the moment, or it will remove existing facilities before the start of construction works. Part of the electricity generated by the future plant will be used by INA’s production facilities, while the majority of produced electricity will be sold to state-owned power utility HEP.
In March, INA said that it has decided to start bitumen production at its oil refinery in Sisak, which should take place in March 2021. The company‘s management said that processing of crude oil at Sisak is planned until the end of the first half of 2019, after which the refinery will enter the transformation process. It will continue as a logistics center, while other projects will include the production of bitumen, lubricants and potentially production of bio fuels.

This is a part of INA‘s 2023 downstream program, along with the transformation of its other oil refinery in Sisak into an industrial site, effectively closing the plant. The program is focused on ensuring sustainability and profitability of refining and marketing operations, as well as the whole company through changes of the current downstream business model. INA said that although the refinery in Sisak will be closed, it will still remain a valuable par of INA‘s operation and a major employer. The alternatives for Sisak would include the development of bio-component refining and petrochemical production conditional to viable business case, and positive development of EU and Croatian legislation. It would also include a modern logistics hub, bitumen, renewables, lubricant production or other sustainable and economically viable operations.

 

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Region: Romania, Greece sign MoU to boost LNG supply and regional energy integration

At the Partnership for Transatlantic Energy Cooperation 2025 (P-TEC 2025) forum in Athens, Romanian Nova Power & Gas, Transgaz, and Greek Atlantic-See LNG Trade signed a memorandum of understanding to enhance cooperation on liquefied natural gas (LNG) supply and...

Romania: Day-ahead power prices surge 36% year-on-year in October 2025

The average day-ahead electricity price on Romania’s OPCOM energy exchange rose to 121.9 EUR/MWh in October 2025, marking a 35.9 % increase year-on-year and 25.6 % higher than in September (97.05 EUR/MWh). Trading activity reached 1.47 million MWh, down 3.5...

Hungary granted one-year US sanctions waiver to continue importing Russian energy

Hungarian Prime Minister Viktor Orbán announced that Hungary has secured an exemption from US sanctions on Russian oil and gas, following a meeting with US President Donald Trump in Washington. The waiver allows Hungary to continue importing Russian crude...
Supported byVirtu Energy
error: Content is protected !!