Slovenia: Climate negotiator challenges...

Former Slovenian State Secretary and climate negotiator Zoran Kus has filed a petition...

Romania: Constanța to get...

A new high-efficiency cogeneration plant is under development on the site of the...

Romania: Ministry of Energy...

The Romanian Ministry of Energy has finalized a five-point plan aimed at lowering...

Bosnia and Herzegovina: EPBiH...

State-owned power utility EPBiH has opened a tender for the preparation of the...
Supported byClarion Energy
HomeSEE Energy NewsCroatia: Electricity production...

Croatia: Electricity production in September

In September 2020 net electricity production in Croatia amounted to 974 GWh, which is 31.3 % higher compared to September last year, when the production amounted to 742 GWh, according to short-term indicators of energy statistics published by Croatian Bureau of Statistics.

During September, 357 GWh of electricity or 36.7 % was produced in hydropower plants, 395 GWh or 40.6 % was produced in thermal power plants, while wind farms produced 137 GWh or 14.1 % of total produced electricity. During this period, Croatia imported 881 GWh of electricity, 17.9 % less compared to last September (1,073 GWh), while electricity exports stood at 473 GWh, 30.7 % more than in September 2019 (362 GWh). Regarding hydrocarbon production, Croatia produced 49 million cubic meters of natural gas in September 2020, 39.5 % less compared to September last year. Natural gas imports stood at 173 million cubic meters, 8.1 % more than in September 2019. Crude oil production stood at 44,000 tons, which is 15.4 % lower compared to the same month last year. Production of petroleum products stood at 307,000 tons in September 2020, which is 6.1 % less than in the same month last year.

 

 

 

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Slovenia: Climate negotiator challenges legality of Krsko nuclear power plant expansion plan

Former Slovenian State Secretary and climate negotiator Zoran Kus has filed a petition with the Constitutional Court challenging the legality of the national spatial plan procedure for the proposed second unit at the Krsko nuclear power plant. Representing public...

Romania: Constanța to get modern gas-hydrogen cogeneration plant, replacing 1970s infrastructure

A new high-efficiency cogeneration plant is under development on the site of the former CET Palas facility in Constanța, replacing infrastructure dating back to the 1970s. Valued at 120 million euros and largely financed through the National Recovery and...

Romania: Ministry of Energy unveils five-point plan to cut electricity prices by 20–25%

The Romanian Ministry of Energy has finalized a five-point plan aimed at lowering electricity prices, with measures expected to take effect next week. Energy Minister Bogdan Ivan stated that the initiative, developed in consultation with producers, distributors, suppliers, and...
Supported byVirtu Energy
error: Content is protected !!