Montenegro: BSD Mont plans...

Montenegrin company BSD Mont has announced plans to build an 84 MW hybrid...

North Macedonia: Energy consumption...

In October 2024, North Macedonia's total electricity consumption reached 450,997 MWh, with natural...

Greece: ADMIE completes Athens-Crete...

Greek electricity transmission system operator ADMIE has completed the development of the Athens-Crete...

Bosnia and Herzegovina: Severe...

According to Bosnia's state-owned power utility, ERS, several power outages have affected over...
Supported byClarion Energy banner
HomeSEE Energy NewsBulgaria, ICGB launched...

Bulgaria, ICGB launched tender for IGB pipeline insurance

ICGB, the independent operator of Greece-Bulgaria gas interconnection (so-called IGB gas pipeline), has launched a tender worth 2.7 million euros for insurance of the said pipeline.

According to tender documentation, the planned contract envisages insurance against all risks of property damage, including machinery breakdown and operation disruption.

The tender also covers general liability insurance, insurance against terrorism, sabotage, riots, strikes, civil disturbances and malicious acts. The deadline for bids submission is 21 March.

Last month, Executive Director of ICGB Teodora Georgieva said that the capacity of gas interconnector has been booked at almost 94 %.

She said that, at the moment, the main source of supplies for the IGB pipeline is gas flowing through the Trans-Adriatic (TAP) pipeline.

About half of the 3 billion cubic meters per year capacity of the pipeline, namely 1.57 billion is booked under long- term contracts for up to 25 years. The rest in terms of free capacity is offered on the PRISMA and RBP platforms.

Commercial operation of the interconnector with annual capacity of 3 billion cubic meters of gas started on 1 October.

The gas interconnector between Greece and Bulgaria can have its capacity increased to 5 billion cubic meters, which will also allow for reverse flow in the direction of Stara Zagora – Komotini.

This requires the construction of a compressor station in Komotini, which will be ready in 2024, at the same time as the commissioning of the LNG terminal in Alexandroupoli in northern Greece.

Sign up for updates & special reports

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Montenegro: BSD Mont plans 84 MW hybrid power plant in Rožaje municipality

Montenegrin company BSD Mont has announced plans to build an 84 MW hybrid power plant in the northeastern municipality of Rožaje. The Montenegrin Government has granted approval for the preparation of the necessary technical documentation for the project. The Cosovica...

North Macedonia: Energy consumption and production in October

In October 2024, North Macedonia's total electricity consumption reached 450,997 MWh, with natural gas usage amounting to 17.69 million cubic meters, coal consumption at 246,735 tons, and petroleum products consumption at 103,513 tons, according to data from the State...

Greece: ADMIE completes Athens-Crete electricity interconnection

Greek electricity transmission system operator ADMIE has completed the development of the Athens-Crete electricity interconnection, a €1.1 billion project. The company has announced that preliminary testing and equipment pre-commissioning have begun, with trial operations expected to follow soon. The testing...
Supported bySEE Mining News
error: Content is protected !!