Romania: Cernavoda Unit 2...

Unit 2 of Romania’s sole nuclear power plant, Cernavoda, was brought back online...

Montenegro: Major renewable energy...

Two significant renewable energy projects are progressing in the village of Korita, located...

Bulgaria: Solaris Holding launches...

Solaris Holding, a joint venture between Bulgarian-German solar developer Sunotec and Eurohold Bulgaria,...

Bosnia and Herzegovina: Electricity...

Gross electricity production in the Federation of Bosnia and Herzegovina (FBiH) reached 512...
Supported byClarion Energy
HomeSEE Energy NewsBulgaria: IBEX reports...

Bulgaria: IBEX reports slight dip in day-ahead electricity trading volume for September

In September 2024, the Independent Bulgarian Energy Exchange (IBEX) recorded a total of 2,369,644.8 MWh traded on its day-ahead market, marking a 0.7% decrease from August. However, this volume represents an 11% increase compared to the same month last year, with an average daily traded volume of 78,988.2 MWh.

The average baseload price for September was 106.94 euros/MWh, down 15.6% from July’s average of 126.7 euros/MWh. The average peak price also decreased, settling at 109.72 euros/MWh, a 7.4% drop. The market saw an increase in participation, with 123 registered participants, two more than the previous month.

On the intraday market, trading reached 282,064.5 MWh, a 10.7% increase, while the average weighted price fell by 16.1% to 108.32 euros/MWh.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania: Cernavoda Unit 2 returns to service following safety inspections and smoke incident

Unit 2 of Romania’s sole nuclear power plant, Cernavoda, was brought back online on the morning of 27 June after a controlled shutdown on 25 June for inspections and minor repairs. Operator Nuclearelectrica confirmed that all corrective actions complied...

Montenegro: Major renewable energy projects advance in Korita

Two significant renewable energy projects are progressing in the village of Korita, located in Bijelo Polje municipality, Montenegro: a €200 million solar power plant and a wind farm with an installed capacity of 72.6 MW. The wind farm, developed by...

Montenegro: EPCG secures €25.63 million EBRD loan to expand Gvozd wind farm capacity

Montenegrin state-owned power utility EPCG has obtained government approval to borrow 25.63 million euros from the European Bank for Reconstruction and Development (EBRD) to finance the second phase of the Gvozd wind farm, which will add 21 MW of...
Supported byVirtu Energy
error: Content is protected !!