Slovenia: NPP Krsko exceeds...

In September 2025, the Krsko nuclear power plant, jointly owned by Slovenia and...

Romania: Electrica completes 27...

Romanian electricity distributor and supplier Electrica has completed the construction of the Satu...

Romania: NEPI Rockcastle launches...

NEPI Rockcastle, the largest owner and operator of shopping centers in Central and...

Bulgaria: Bulgargaz secures LNG...

Bulgaria’s state-owned natural gas supplier Bulgargaz has completed a tender to meet part...
Supported byClarion Energy
HomeSEE Energy NewsBosnia and Herzegovina:...

Bosnia and Herzegovina: Increase in electricity production, imports and lignite output in July

According to the Agency for Statistics of Bosnia and Herzegovina, gross electricity production in the country reached 1,283 GWh in July 2024, up from 1,275 GWh during the same month last year. Hydropower plants contributed 30.1%, thermal power plants 65.9%, and solar and wind power plants accounted for 4% of the total production.

Net hydropower generation was recorded at 385 GWh, reflecting a 12.5% decrease compared to July 2023. Conversely, thermal power production rose by 7.2% to 759 GWh, while electricity generated from renewable sources (wind and solar) totaled 51 GWh.

Electricity imports surged by 38.2% to 420 GWh in July 2024, compared to 304 GWh in July 2023. Exports also increased, rising by 14.6% to 660 GWh from last year’s 576 GWh.

Lignite production in Bosnia and Herzegovina reached 409,000 tons in July 2024, a slight increase of 0.3% from the previous year. However, brown coal production declined significantly, falling by 20.9% to 468,000 tons. Additionally, natural gas imports increased by 8.6%, totaling 9.83 million cubic meters, compared to 9.05 million cubic meters in July 2023.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

From Čačak to Europe: Nearshoring shared business services with regional talent and real connectivity

Čačak sits in the heart of Serbia with an asset mix that plays perfectly to near-sourcing: a deep regional talent catchment, motorways that cut transit times to major hubs, and operating costs that let you scale shared business services...

The new currency of trust: Where technical risk meets financial consequence

In modern infrastructure, oversight isn’t a paperwork ritual—it’s a translation exercise. Design choices, test results, and schedule slips must be converted into hard numbers a credit committee can act on. That alignment of technical risk with financial consequence has...

When ESG gaps halt financing: The Owner’s Engineer’s role in industrial projects

In industrial construction today, an ESG non-conformity can hold a loan tranche as effectively as a failed transformer test. Lenders and investors now expect the Owner’s Engineer (OE) to treat environmental, social, and governance risks with the same rigor...
Supported byVirtu Energy
error: Content is protected !!