Romania: Cernavoda Unit 2...

Unit 2 of Romania’s sole nuclear power plant, Cernavoda, was brought back online...

Montenegro: Major renewable energy...

Two significant renewable energy projects are progressing in the village of Korita, located...

Bulgaria: Solaris Holding launches...

Solaris Holding, a joint venture between Bulgarian-German solar developer Sunotec and Eurohold Bulgaria,...

Bosnia and Herzegovina: Electricity...

Gross electricity production in the Federation of Bosnia and Herzegovina (FBiH) reached 512...
Supported byClarion Energy
HomeSEE Energy NewsAlbania: OSHEE reports...

Albania: OSHEE reports 5% decrease in electricity distribution losses in 2024

The Albanian electricity distribution system operator, OSHEE, has announced a notable reduction in losses within its distribution network. In the first nine months of 2024, OSHEE recorded losses of 1,055,363 MWh, representing a 5% decrease compared to the same period last year. This reduction translates to 55,300 MWh less in losses.

The total electricity fed into the network during this timeframe was 5,626,717 MWh. Financially, OSHEE lost €5.6 million less than in the previous year, reflecting improved efficiency. The percentage of electricity losses in the distribution network also dropped to 17.23%, down from 18.76% during the same period last year.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania: Cernavoda Unit 2 returns to service following safety inspections and smoke incident

Unit 2 of Romania’s sole nuclear power plant, Cernavoda, was brought back online on the morning of 27 June after a controlled shutdown on 25 June for inspections and minor repairs. Operator Nuclearelectrica confirmed that all corrective actions complied...

Montenegro: Major renewable energy projects advance in Korita

Two significant renewable energy projects are progressing in the village of Korita, located in Bijelo Polje municipality, Montenegro: a €200 million solar power plant and a wind farm with an installed capacity of 72.6 MW. The wind farm, developed by...

Montenegro: EPCG secures €25.63 million EBRD loan to expand Gvozd wind farm capacity

Montenegrin state-owned power utility EPCG has obtained government approval to borrow 25.63 million euros from the European Bank for Reconstruction and Development (EBRD) to finance the second phase of the Gvozd wind farm, which will add 21 MW of...
Supported byVirtu Energy
error: Content is protected !!