Romania: Parapet and Alerion...

Romanian renewable energy engineering company Parapet has signed seven new contracts with Italian...

North Macedonia: Day-ahead power...

In October 2025, electricity trading on North Macedonia’s day-ahead market reached 146,498 MWh,...

Greece: ExxonMobil, Energean and...

A new stage in Greece’s offshore energy exploration has begun as ExxonMobil, Energean,...

Croatia: CROPEX electricity trading...

In October 2025, a total of 1,449,339.1 MWh of electricity was traded on...
Supported byClarion Energy
HomeSEE Energy NewsAlbania, 234...

Albania, 234 MW wind farm project declared strategic investment

Biopower Green Energy and Marseglia Group have been granted strategic investment status in Albania for two wind farm projects worth a total of 244m euros. The companies intend to install wind turbines with a combined capacity of 234 MW.

According to the Albanian Ministry of Infrastructure and Energy and the Energy Regulatory Agency, a 373.1 MW wind farm is currently under development in Albania. The country still does not have a single wind turbine installed.

The Albanian Development Agency decided last year to declare the 234 MW wind project a strategic investment. Developers with this status receive access to support programs and administrative assistance, especially in the case of land expropriation.

The developers of the project are Biopower Green Energy and Marseglia Group, and wind turbines will be installed in Lezi in the northwest of the country, near the Adriatic Sea.

The 244m-euro project consists of 39 turbines, according to earlier reports. Marseglia, based in Verona, Italy, launched the project in 2008.

Units BPGE1 (114 MW) and BPGE2 (120 MW) should be built on the ridges of two mountains, on a total area of ​​100 hectares. The first wind farm is planned to be set up near Shengjin at an altitude of 241 to 545 meters. The second wind farm is planned on a location along the coast at 200 to 350 meters above sea level.

The second largest planned project, 69.3 MW, owned by EU Green Energy, is to be built in the south of the country in Dropul.

The list also includes five projects with a capacity of 10 MW, as well as six projects of 3 MW.

The procedure for obtaining a permit for projects up to 3 MW is much simpler because they only require the signature of the Minister. According to the valid decision of the regulator, they would be entitled to a preferential tariff of 76 euros per MWh.

For next year, the government in Tirana is preparing an auction for wind with a quota of 100 MW, and it could be increased to 150 MW.

Source: balkangreenenergynews.com

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania: Parapet and Alerion sign seven new solar projects totaling 80 MW

Romanian renewable energy engineering company Parapet has signed seven new contracts with Italian renewables developer Alerion, expanding their long-term partnership with projects totaling nearly 80.8 MW across Romania and Italy. Construction will take place in Romania’s Teleorman and Călărași counties...

North Macedonia: Day-ahead power trading jumps 82% year-on-year in October 2025

In October 2025, electricity trading on North Macedonia’s day-ahead market reached 146,498 MWh, marking an 81.7% increase compared to the same month last year and a 43% rise from September. According to the market operator MEMO, the average market-clearing price...

Greece: ExxonMobil, Energean and Helleniq launch new offshore exploration phase in Ionian Sea

A new stage in Greece’s offshore energy exploration has begun as ExxonMobil, Energean, and Helleniq Energy signed a farm-in agreement granting them joint ownership of 60% in Block 2 of the Ionian Sea, located northwest of Corfu. The signing...
Supported byVirtu Energy
error: Content is protected !!