Why OE-governed quality assurance...

In every mature renewable market, there comes a moment when engineering quality—once assumed,...

Insurance, force majeure and...

In the early stages of Southeast Europe’s renewable expansion, wind investors focused primarily...

ESG, community strategy and...

For years, wind investment strategies in Southeast Europe focused almost exclusively on technical...

The grid-ready wind farm...

A decade ago, the success of a wind farm in Southeast Europe was...
Supported byClarion Energy
HomeSEE Energy NewsSlovenia: NPP Krsko...

Slovenia: NPP Krsko exceeds planned output in September 2025, begins scheduled overhaul

In September 2025, the Krsko nuclear power plant, jointly owned by Slovenia and Croatia, generated 449,426 MWh of net electricity, slightly exceeding the planned output of 446,000 MWh by 0.77%.

On 28 September, NPP Krsko completed its 34th fuel cycle and began a scheduled overhaul. During this cycle, the plant produced a total of 8,514.5 GWh of electricity. In comparison, in September of the previous year, the plant generated 496,008 MWh of net electricity, 0.6% above the planned 493,000 MWh.

The plant operated within all technical specifications, with all safety systems fully functional. Both the availability and capacity factors reached 100%, and no technical issues were reported during the period.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Why OE-governed quality assurance is becoming the new currency of wind asset value in Southeast Europe

In every mature renewable market, there comes a moment when engineering quality—once assumed, often overlooked—becomes the defining currency of asset value. Southeast Europe is entering that moment now. Serbia, Romania, Croatia, and Montenegro are witnessing a scale-up in wind...

Insurance, force majeure and financial risk transfer — the new architecture of protection for wind investors in Southeast Europe

In the early stages of Southeast Europe’s renewable expansion, wind investors focused primarily on EPC contracts, turbine warranties, and revenue support mechanisms. Insurance was treated as a formal requirement—necessary for lenders, but rarely integrated into strategic project design. That...

ESG, community strategy and social license — the hidden financial drivers of wind success in Southeast Europe

For years, wind investment strategies in Southeast Europe focused almost exclusively on technical variables: resource quality, EPC pricing, grid access, and financing structure. But as markets mature, a new set of forces is emerging—less visible than capex or P50...
Supported byVirtu Energy
error: Content is protected !!