Romania: GE Vernova secures...

GE Vernova has signed an agreement with Greenvolt International Power to supply wind...

Montenegro launches geological surveys...

Geological surveys for the Krusevo hydropower plant have started, marking the first concrete...

Montenegro: EPCG and France’s...

Montenegro’s state-owned power utility EPCG has signed a cooperation agreement with French renewable...

Croatia enters heating season...

Croatia is entering the new heating season with stable gas supplies, high storage...
Supported byClarion Energy
HomeSEE Energy NewsSlovenia: Hydropower output...

Slovenia: Hydropower output drops sharply in June amid low rainfall

In June 2025, hydropower plants on Slovenia’s Drava, Sava, and Soča rivers delivered 341 GWh of electricity to the transmission network—just over 60% of the volume produced in June 2024 and 18% below initial forecasts.

The decline was most pronounced in the Sava basin, where reduced rainfall significantly impacted production. Power plants on the upper and lower Sava generated only 43.3 GWh, a decrease of 65.2 GWh—or more than 60%—compared to the same month last year.

Drava and Soča hydropower plants were also affected by unfavorable hydrological conditions, though to a lesser extent. The Drava plants produced 245.7 GWh in June, a 35.2% year-on-year drop, while the Soča system generated 52 GWh, down 31.3% from June 2024.

Although 2025’s hydropower performance has been weaker than last year’s, it’s important to note that 2024 was exceptionally favorable for hydro production. Hydropower plants exceeded their annual targets well before year-end. In the first half of 2025, total hydropower output reached just over 2,100 GWh—about 25% less than in the same period of 2024 but still more than 8% above long-term average projections.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania to permanently close Isalnita coal-fired power plant in January 2026

Romania’s Ministry of Energy has announced that the coal-fired Isalnita thermal power plant in Dolj county will be permanently shut down on 1 January 2026. The plant is part of the Energy Complex (EC) Oltenia. Energy Minister Bogdan Ivan made...

Romania: GE Vernova secures order to supply 252 MW Ialomita wind project

GE Vernova has signed an agreement with Greenvolt International Power to supply wind turbines for the 252 MW Ialomita wind farm in southeastern Romania. The order, confirmed in the third quarter of 2025, includes the delivery, installation, and commissioning of...

Montenegro launches geological surveys for strategic HPP Krusevo

Geological surveys for the Krusevo hydropower plant have started, marking the first concrete step in one of Montenegro’s key energy projects. The work follows a contract signed on 29 November 2024 between EPCG and the Jaroslav Cerni Institute for...
Supported byVirtu Energy
error: Content is protected !!