Regional power-flow shifts after...

The shutdown of Pljevlja transforms Montenegro’s internal energy balance, but its implications extend...

Private wind producers in...

Montenegro’s power system is undergoing a quiet reordering of influence. Where state hydro...

Balancing costs in Montenegro’s...

As Montenegro steps into a future without Pljevlja’s coal-fired stability, the cost of...

Montenegro’s power future: Transitioning...

Montenegro finds itself at a key inflection point. The only coal-fired thermal power...
Supported byClarion Energy
HomeSEE Energy NewsCroatia: CROPEX sets...

Croatia: CROPEX sets record in 15-minute and 60-minute product trading on 13 January 2025

CROPEX’ intraday continuous market set a new record on 13 January 2025, with 987.23 MWh traded in 15-minute products. In addition, the trading volume of 60-minute products reached 7,060.20 MWh, bringing the total daily volume for the delivery day to 8,047.43 MWh.

The introduction of 15-minute products on CROPEX’ intraday continuous market on 10 January 2024 has proven successful, as evidenced by this record-breaking performance. The growing adoption of these shorter trading intervals highlights the increasing ability of market participants to optimize portfolio planning with greater precision.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Regional power-flow shifts after the Pljevlja shutdown: Montenegro in a rewired Balkan energy landscape

The shutdown of Pljevlja transforms Montenegro’s internal energy balance, but its implications extend beyond national borders. In the interconnected Balkan power system, every addition or removal of a major unit reshapes flows, congestion points, trade patterns and price correlations....

Private wind producers in Montenegro: From peripheral players to system-defining actors

Montenegro’s power system is undergoing a quiet reordering of influence. Where state hydro once dominated unchallenged and Pljevlja provided the stable backbone, private wind producers are emerging as system-defining actors. They are reshaping generation patterns, altering the economics of...

Balancing costs in Montenegro’s post-coal power system

As Montenegro steps into a future without Pljevlja’s coal-fired stability, the cost of balancing becomes the defining economic metric of its power system. Balancing is never a simple technicality; it is the financial manifestation of volatility. When wind ramps...
Supported byVirtu Energy
error: Content is protected !!