Financing wind in Montenegro,...

The landscape of renewable finance in Southeast Europe has undergone a profound transformation....

How Southeast Europe’s grid...

Wind development in Southeast Europe is accelerating at a pace unimaginable only a...

Serbia–Romania–Croatia: The new triangular...

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside...

The bankability gap in...

The transformation of Southeast Europe into a credible wind-investment region has been rapid,...
Supported byClarion Energy
HomeSEE Energy NewsMontenegro: EPCG reconnects...

Montenegro: EPCG reconnects historic hydropower plants Podgor and Rijeka Crnojevica after €1.6 million reconstruction

Montenegrin state-owned power utility EPCG has announced the reconnection of its small hydropower plants (SHPP) Podgor and Rijeka Crnojevica to the electricity grid following a complete reconstruction. The renovation, valued at approximately €1.6 million, included the full replacement of hydro-mechanical and electrical equipment, installation of power and control systems, as well as interior and exterior upgrades to the machinery building. The rehabilitation also involved the modernization of intake structures, along with the implementation of a remote management and monitoring system linked to HPP Perucica, under whose management the plants now operate.

SHPP Podgor and SHPP Rijeka Crnojevica are the oldest electricity generation facilities owned by EPCG, having been commissioned in 1941. They have been out of service since 2015. With the reconstruction completed, the two plants are expected to generate around 3.5 GWh of green electricity annually.

Radovan Djukanovic, Director of HPP Perucica, noted that the reconstruction also allows the plants to operate autonomously, managed remotely from HPP Perucica. The reconstruction process began in 2017, with the conceptual design being finalized by late 2018. A public tender for the development of the main design and equipment procurement was held, resulting in a contract awarded to local company Vigoris in early 2023.

SHPP Podgor has an installed capacity of 360 kW and is expected to produce 1.8 GWh annually, while SHPP Rijeka Crnojevica, with an installed capacity of 451 kW, is projected to generate 1.7 GWh of green electricity each year.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Financing wind in Montenegro, Serbia, Croatia and Romania — why international lenders are returning to Southeast Europe

The landscape of renewable finance in Southeast Europe has undergone a profound transformation. A decade ago, lenders viewed the region with a degree of caution, shaped by fluctuating regulatory frameworks, limited track records, and the perceived fragility of local...

How Southeast Europe’s grid bottlenecks will reshape project valuation, offtake strategy and EPC designs by 2030

Wind development in Southeast Europe is accelerating at a pace unimaginable only a decade ago, yet the region’s grid infrastructure is straining under the weight of its own renewable ambition. Serbia is preparing for multi-gigawatt expansion, Romania is restarting...

Serbia–Romania–Croatia: The new triangular wind corridor — is Southeast Europe becoming Europe’s next Iberia?

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside Europe: strong resource, open land, grid-ready corridors, competitive auctions, and the steady inflow of international capital. Investors seeking scale, yield, and policy clarity migrated naturally towards...
Supported byVirtu Energy
error: Content is protected !!