Why OE-governed quality assurance...

In every mature renewable market, there comes a moment when engineering quality—once assumed,...

Insurance, force majeure and...

In the early stages of Southeast Europe’s renewable expansion, wind investors focused primarily...

ESG, community strategy and...

For years, wind investment strategies in Southeast Europe focused almost exclusively on technical...

The grid-ready wind farm...

A decade ago, the success of a wind farm in Southeast Europe was...
Supported byClarion Energy
HomeNews Serbia EnergySerbia: Draft amendments...

Serbia: Draft amendments to Energy Law introduce key changes

The draft amendments to Serbia’s Energy Law propose several significant updates, including the regulation of the balancing market and the reintroduction of nuclear energy into the country’s energy mix. The amendments also introduce provisions for end consumers to become active participants, allowing them to enter into contracts with variable pricing.

The Ministry of Mining and Energy has published the draft law and invites public feedback until September 10. Key changes include:

  • Supplier switching: The process of changing suppliers, currently free, may incur charges starting January 1, 2026.
  • Variable pricing contracts: End consumers will have the option to sign contracts with variable electricity prices, reflecting market changes at intervals aligned with organized market or exchange pricing.
  • Comparison tool: Household and small consumers with annual consumption below 100,000 kWh will have free access to a supplier comparison application.
  • Net billing and metering: The draft law proposes the abolition of net billing and net metering for prosumers by December 31, 2026.
  • Installer certification: The certification of renewable energy facility installers will be introduced, aligning with EU’s Renewable Energy Directive (RED II) and practices from Croatia, Slovenia, and Italy.
  • Active consumers: Defined as consumers or groups who generate, store, or sell electricity independently or participate in flexibility services without making these activities their primary business.
  • Balancing responsibility: Market participants will be financially accountable for balancing deviations they cause, contributing to system balance.
  • Capacity mechanism: The draft introduces a capacity mechanism and stipulates that from July 1, 2025, power plants emitting more than 550 g of CO2 per kWh and over 350 kg of CO2 annually per installed kW capacity cannot participate in this mechanism.
Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Why OE-governed quality assurance is becoming the new currency of wind asset value in Southeast Europe

In every mature renewable market, there comes a moment when engineering quality—once assumed, often overlooked—becomes the defining currency of asset value. Southeast Europe is entering that moment now. Serbia, Romania, Croatia, and Montenegro are witnessing a scale-up in wind...

Insurance, force majeure and financial risk transfer — the new architecture of protection for wind investors in Southeast Europe

In the early stages of Southeast Europe’s renewable expansion, wind investors focused primarily on EPC contracts, turbine warranties, and revenue support mechanisms. Insurance was treated as a formal requirement—necessary for lenders, but rarely integrated into strategic project design. That...

ESG, community strategy and social license — the hidden financial drivers of wind success in Southeast Europe

For years, wind investment strategies in Southeast Europe focused almost exclusively on technical variables: resource quality, EPC pricing, grid access, and financing structure. But as markets mature, a new set of forces is emerging—less visible than capex or P50...
Supported byVirtu Energy
error: Content is protected !!