Slovenia: Hydropower production remains...

Unfavorable hydrological conditions have affected Slovenia this year, yet data from the first...

Romania: Plose solar power...

The Plose solar power plant in Calarasi County has been officially connected to...

Bulgaria boosts power production...

According to data from Bulgarian electricity transmission system operator ESO, the country produced...

Bosnia and Herzegovina: EPBiH...

State-owned power utility EPBiH has introduced a new household electricity billing system, following...
Supported byClarion Energy
HomeUncategorizedRomania: EC launched...

Romania: EC launched an anti-subsidy investigation against Longi, Shanghai Electric

The European authorities are trying to determine whether two consortia – including subsidiaries of Longi and Shanghai Electric – violated the new EU rules on foreign subsidies when they participated in a procurement process in Romania for a 110 MW solar farm. The European Commission is expected to make a final decision within 110 working days.

The European Commission has launched two in-depth investigations to determine whether two consortia violated the Foreign Subsidies Regulation in a 110 MW PV tender in Romania.

“According to the Foreign Subsidies Regulation, companies are obliged to notify their public procurement tenders in the EU when the estimated value of the contract exceeds €250 million, and when the company was granted at least €4 million in foreign financial contributions from at least one-third country in the three years before notification,” the European Commission said in a statement. “Following its preliminary review of all the submissions, the commission considered it justified to open an in-depth investigation for two bidders, since there are sufficient indications that both have been granted foreign subsidies that distort the internal market.”

The tender was held by the special purpose vehicle Societatea Parc Photovoltaic Rovinari Est S.A. and is being partly financed by the EU modernization fund.

The first of the two groups under investigation include Romanian engineering firm Enevo Group and Longi Solar Technologie GmbH, which is the German subsidiary of Chinese solar module maker Longi. The second consortium includes Shanghai Electric UK and Shanghai Electric Hong Kong International Engineering, which are two units of Chinese industrial conglomerate Shanghai Electric.

“During the in-depth investigation, the commission will further assess the alleged foreign subsidies and obtain all the information required to establish whether they may have allowed the companies to submit an unduly advantageous offer in reply to a tender. Such an offer could cause other companies participating in the public procurement procedure to potentially lose sales opportunities,” said the commission.

A final decision on the case should be announced within 110 working days, pv-magazine reports.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania sees sharp rise in crude oil imports amid declining domestic production

Data from the Romanian National Institute for Statistics (INS) shows that crude oil imports in Romania reached 4.375 million tons of oil equivalent (toe) in the first six months of 2025, up 1.005 million toe or 29.8% compared to...

Romania: Plose solar power plant connected to national grid, boosting renewable capacity

The Plose solar power plant in Calarasi County has been officially connected to Romania’s national electricity grid, marking a significant step in the country’s renewable energy development. The project was developed by Alerion Clean Power and constructed by Parapet,...

Romania calls for faster cross-border power links to cut energy prices and boost competitiveness

Romania is calling on the European Commission and neighboring countries to accelerate the expansion of cross-border electricity interconnections, stressing that reducing electricity prices is vital for protecting the competitiveness of both European and Romanian industry. The appeal was made...
Supported byVirtu Energy
error: Content is protected !!