Romania: INVL Renewable Energy...

INVL Renewable Energy Fund I, managed by INVL Asset Management and focused on...

Croatia: Summary of Guarantees...

On 29 July, a total of 231,827 Guarantees of Origin (GOs) were sold...

Bulgaria: TPP Maritsa 3...

Bulgarian thermal power plant Maritsa 3 reported a net loss of €2.7 million...

Bulgaria: Bobov Dol thermal...

The Bulgarian thermal power plant Bobov Dol posted a net profit of approximately...
Supported byClarion Energy
HomeSEE Energy NewsBulgaria: Electricity production...

Bulgaria: Electricity production reached 38.2 TWh in 2023

Electricity production in Bulgaria decreased by an annual 20.9% to 38,288 GWh between January 1 and December 17, according to the data published by Electricity System Operator (ESO).

In the same period, electric consumption went down 4.2% to 34,995 GWh, ESO said in a weekly data release.

The country’s power trade surplus plunged 72.3% year-on-year to 3,293 GWh in the review period.

The volume of renewable energy in the transmission network jumped by 59.04% to some 2,426 GWh. Solar power soared by an annual 144.1% to roughly 1,553 GWh, whereas wind power added 4.43% to some 775 GWh.

The volume of renewable energy in the distribution system increased by 12.8% to 2,394 GWh. The output of hydropower plants fell by 18.5% year-on-year to 3,009 GWh in the same period.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania: INVL Renewable Energy Fund I secures €29.3 million loan for 71 MW solar project

INVL Renewable Energy Fund I, managed by INVL Asset Management and focused on renewable energy projects, has obtained a €29.3 million loan from Kommunalkredit Austria to finance the construction of a 71 MW solar power plant in Dolj County,...

Croatia: Summary of Guarantees of Origin auctions for electricity held on 29 July

On 29 July, a total of 231,827 Guarantees of Origin (GOs) were sold in auctions organized by HROTE and ENNA Next. These auctions were conducted in five parallel sessions via CROPEX’s IT trading platform, covering GOs from wind, biogas,...

Bulgaria: TPP Maritsa 3 narrows loss to €2.7 million in first half of 2025

Bulgarian thermal power plant Maritsa 3 reported a net loss of €2.7 million in the first half of 2025, a significant improvement compared to a €11.5 million loss during the same period in 2024. The company’s total revenues fell to...
Supported byVirtu Energy
error: Content is protected !!